Laserfiche WebLink
EMBANKMENT. <br /> <br />1. Adequacy of the vegetative cover: Excellent, ode Few, Poor <br />2. Erosion forming gullies: Extensive, Some, ery ew, None <br />3. Is wave action causing erosion: <br /> On the upstream embarkment? Yes No ~ <br /> At the principal spI-way inlet? Yes No ~ <br />d. Erosion of the downstream toe of the embankment? Yes No ~ <br /> The cause of the erosion is attributed [o: <br />5. Is seepage occurring through the dam? Yes No t~- <br /> Could this seepage cause potential instability? Yes No <br /> Explain: <br />PRINCIPAL SPILLWAY <br />1. Is the principal spillway system in working order? Yes ~' Vo <br />2. Is the inlet free of debris and restrictive material" Yes `-- Vo <br />3. Is the discharge outlet free of resiricdve material? Y"es ~ Na <br />~. Is erosion occurring at the discharge outlet? Yes No (i <br />Evaluate the severity: Exensive Moderate Just Starting Vone <br />EIAERGENCY SPILLWAY <br />1. Is the overall emergenry spillway system caoab(e of passing design storm discharge? <br />Y'es ~ ~o <br />Z. Does it appear as if the emergency spillway has discharged water since the fast inspection° <br />Yes ~o ~- <br />3. Is erosion occurring at any section of the emergenc: ;piilway':' Yes Vo L--- <br />Describe the eetent <br />SEDIMENT STORAGE CAPACITY <br />1. Has the design stoFage capacity of the reservoir been stup~sed? Yes ~o ~ <br />If yes, expl~}n: o.iJ 7 !_f /~~ /~~ ~ ~ ~„~~ ~ i ' ~ ~ /.: c7`~_ <br />Please add any special comments concerning potentially dangerous problems ou the baci: of this <br />sheet! /,//1 ~~y//J_ <br />inspected by: / ~ /~tiCinM~' <br />