Laserfiche WebLink
~.' <br /> <br /> <br /> J ~ " <br /> <br /> <br /> \. ^ <br /> <br />DES No. /U"~ <br />Date of Inspecti <br />EMBANKMENT <br />1. Adequacy of [he vegetative cover: Excellent, Mo erfl ate, ' Few, Poor <br />2. Erosion forming gullies: Et"tensive, Some, er~'v, None <br />3. Is wave action causing erasion: <br />On the upstream embankment? ,J Yes No ~ <br />A[ [he principal spilhyay inlet? //o~i~f/r'rt c~-`r~ Yes No <br />4. Erosion of the downstream toe of the embankment? Yes No <br />The cause of the erosion is attributed to: ~rr~-~,~,~~%<- <br />d. Is seepage occurring through the dam? /'te'a 1~~~~1 Yes No <br />Could this seepage cause potential instability? Yes No <br />PR1NClPAL SPILLWAY //~ S~',((u;,*Lj ham` ~}'!"~O"'~ ~~ <br />1. Is the principal spillwati system in working ordef' ~ Y"es No <br />2. Is the inlet free of debris and res-~tictiye mattrial^. ~"es Vo <br />?. Is the discharge outlet free of restrictive material? Yes No <br />1. Is erosion occurring at the discharge outle;? Yes ~o <br />Evaluate the severity: E.ctensice Moderate Just Stanin~ ~~one <br />EMERGENCY SPILLWAY /„~ ~„~~..< ~, ~~~~~°-',~~ <br />1. Is the overall emergency spillway system capable of pas,:ng desi;n stcrm discharge? <br />~:"eS CIO <br />3. Does it appear as if the emergene: ;pilhvay has discharged ~.ya[e: since the last tnspeaion' <br />Yes ~o <br />:. Is erosion oc^arrng a[ any section of the emergency spillway'.' Y"es v~o <br />Describe the extent: <br />SEDIMENT S T ORAGE CAPACITY <br />1. I-:as the desi;n stora.e , aoarrr of he reservoir been ;ucpassed° `i es Vo L' <br />Pfease add any species cotnmen[s concerning pocearially dangerous ~blems on the b~acJk of this <br />sheet! p ~~-,~ f~~Jf~yr> <br />Ins ec.ed bv: ~ ~t ~,~--_-- <br />T <br />