Laserfiche WebLink
. ~, ~ I II II IIIIII III IIII I ~ <br /> <br /> STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Ucparnncnt of Natural Kc+ources <br />1 11 S Sherman 51.. Room 115 a <br /> <br />Donvrr. Colorado Yg2U5 ~~ <br /> <br />Phony: ! lq 41 Rhb- {ih.' l <br />I <br />FA%.l4(14i 14}2-BIUb <br /> f)EPARTNIENT t <br /> NATURA <br /> RESOURCF <br /> R°y Knmrr <br />Julys, 1998 Governor <br /> Idnlrf} Inchhrau <br /> E wcwi~e DircUnr <br />Mr. Doren R. Stone ro,,inarl n. Lnng <br />24600 County Road "P" D11yn" o"''°°' <br />Dolores, CO 81323 <br />Re: Stoue Gravel Pit, Permit iYo. M-97-089, Permit Issuance - Coustruction Material Operation <br />Dear Mr. Stone: <br />On July 8, 1998 the Division of Minerals and Geology found Daren Stone to have satisfied the applicable <br />requirements of C.ILS. 34-32.5-101 et ~. for obtaining a mining and reclamation permit. Therefore, a permit <br />is being issued. Two signed originals of the permit have been executed. We have kept one copy for our files <br />and are enclosing one copy for your use. It is your responsibility to comply with all of the terms of the permit. <br />1. All of the original application materials, as amended and supplemented, are an integral part of your <br />permit. They have been incorporated into the permit by reference. We presume that you have a copy of all of <br />these materials; therefore, none have been enclosed with this mailing. We suggest that you keep a copy of the <br />permit and the permit application at the mining operation as a reference for operating personnel, to help ensure <br />compliance with the terms of the permit. <br />2. Changes in the mining and reclamation operations that differ from those described in the permit may <br />require a modification to the permit. We suggest consulting the Construction Materials Rules and Regulations <br />and/or contacting us to determine if a revision to the permit is necessary. Rule 1.10 pertains to Amendments, <br />Rule 1.9 to Technical Revisions, and Rule 1.1 1 to Conversions. <br />3. On your permit anniversary date each year, July 8, you must submit an annual fee and an annual report <br />to us. The annual fee for this permit is $550.00. Please consult the Act, Rules and Regulations, and your permit <br />for specific annual report requirements applicable to your mine. <br />If you have any questions, please the contact the Division. <br />Sincere) , <br />MICHAEL ONG <br />Division Director <br />MBL/WHE/BDC <br />Enclosure <br />M.~OSS~BDC1iEMPMAP730B9 Wr(F <br />