My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE59262
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE59262
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:01:34 PM
Creation date
11/20/2007 6:12:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
4/3/2003
Doc Name
pages 2.05-1 to 2.05-64
Section_Exhibit Name
2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />iiiiiiiiiiiiiiiiii <br />~ -: ~o~. <br />ULE 2.05 - APPLICATION FOR PERMIT FOR SURFACE OR UNDERGROUND if[INING <br />ACTIVITIES -MINIMUM REpUIREMENTS FOR OPERATION AND RECLAMATION PLANS <br />Rule 2.05.1 - Objectives <br />The objectives of 2.0~ are to ensure that the Division is provided with comprehensive and reliable <br />information on proposed surface coal mining and reclamation operations, and to ensure that those operations are <br />allowed to be conducted only in compliance with these Rules and the Act. Infonna[ion presented in the application <br />which addresses 2.05 shall be referenced to the applicable environmental baseline information of 2.04 to <br />demonstrate that a orouosed oueration is being conducted consistent with environmental resources information. <br />RESPONSE <br />Twentymile Coal Company (TCC) will comply with the objectives of Rule 2.05.1. Information regarding the <br />planned underground coal mining and reclamation operations is set forth below. Information regarding the Fish <br />Creek Tipple and connecting haulroad is contained with the Appendix to the Foidel Creek Mine Permit (Volumes <br />VII, VII[, and [X). <br />Rule 2.05.2 -Operation Plan -Estimated Area for Life of Operation <br />Cach auulica[ion shall contain a general description of all surface coal mining operations proposed to be <br />conducted during the life of the mine operation. This general description shall include, a[ a minimum, the <br />following: <br />Production methods and equipment. A narrative description of the general tune and method of coal <br />mining procedures, engineerin to eclmiques, anticipated annual :md total production of coal, by tonnage, and the <br />major equipment to be used for all aspects of those operations and a descriution of the measures to be used to <br />maximize [he use and conservation of the coal resource as required in 4.01.1. <br />RESPONSE <br />The operations of TCC under this permit revision application including the production schedule and the area of <br />underground disturbance, will be dependent upon conditions encountered and information gathered during the <br />presently planned operations as well as future economic conditions. This permit revision application identifies the <br />mining of the Wadge Seam, which is the same coal seam that is mined at the surface operations of Colorado Yampa <br />Coal Company (CYCC). TCC will employ detailed and current engineering design for all underground mining <br />activities in order to maximize resource recovery and safety, and to minimize environmental disturbance. <br />The mining methods planned for the Foidel Creek operation will be room and pillar mining, continuous miner <br />developmental mining, and longwall mining. For the southern mining district, main entries aze planned to be <br />developed north-south, in the Wadge Seam with submains mined to either side as shown on Map 23, Mine Plan, <br />which includes the Life of Mine mining projection. Also, Map 23 shows the five-year mining projections. For the <br />northern, eastern and western mining districts, the orientation of the mains has been rotated slightly from a true <br />north-south or east bearing. The orientation is shown on Map 23. Both sections and longwall panels will be <br />developed from the mains for full seam extraction. <br />The equipment to be used at the Foidel Creek operation will consist of continuous miners, rubber tired haulage <br />vehicles, roof bolters, clean up scoops, belt conveyors and longwall systems. Miscellaneous support equipment <br />such as pumps, mantrip trucks, supply tricks, tube trucks face fans, and electrical <br />-, , ~ <br />nn ~. ... ~ ~. .~ ~, 't ... It) <br />Permit Renewal No. 3 2.OScl 4/1/99 <br />
The URL can be used to link to this page
Your browser does not support the video tag.