My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE59255
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE59255
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:01:33 PM
Creation date
11/20/2007 6:12:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
12/2/2004
Doc Name
2.05.6(3)(a-c) Protection of Hydrological Balance Part 3
Type & Sequence
PR10
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
West Elk Mine <br />• Approximate Box Canyon Mining Area (B Seam) - Longwall Panels (46,930,000 ft 2) and <br />Development Areas (23,121,000 ft. ) <br />• Approximate IONE and 11NE Longwall Panel Area (B Seam) - Longwall Panels (6,603,000 <br />ft.) and Development Areas (4,362,000 ft?) <br />• Average sustained inflows (2003) observed into the mine (100 gpm, 161.3 AF/yr or 7,026,738 <br />ft.s/yr.) <br />• Maximum inflows (1996) observed into the mine (8,000 gpm) or (175,668,449 ft s/yr) <br />• Approximate South of Divide mining area El-E9 panels (E Seam) - Longwall Panels <br />(92,996,122 ft) and Development Areas (1,787,471 ft2) <br />• Average additional sustained inflows into the E Seam workings from the SOD mining azea (100 <br />gpm or 7,026,738 ft s/yr) <br />• Maximum additional inflows into the E Seam workings from the SOD mining area (1,700 gpm) <br />Using these revisions to the "time to fill" calculations results in the following: <br />• Time [o fill F Seam workings (100 gpm) =14.9 years <br />• Time to fill Jumbo Mountain (8NW and 9NW) B Seam workings (100 gpm) =17.7 years <br />• Time to fill Northwest Panel (1NW to 7NW) B Seam workings (100 gpm) =26.6 years <br />• Time to fill Apache Rocks (three western and four eastern panels) B Seam workings (100 gpm) <br />= 65.8 yeazs <br />• Time to fill Apache Rocks (three western panels) E Seam workings (100 gpm) = 31.0 yeazs <br />• Time to fill the l ONE and 11NE Panels B Seam workings (100 gpm) = 7.5 yeazs <br />• Time to fill Box Canyon (18NE to 23NE) B Seam workings (100 gpm) = 49.9 years <br />• Time to fill SOD (El-E9) E Seam workings (100 gpm) = 73.5 years <br />Cumulatively, the estimated "time to fill" the entire West Elk Mine workings in all three coal <br />seams is approximately 290 years (maximum fill time) based on current inflow observations <br />and those additional inflow estimates assumed for the South of Divide miring area. <br />F Seam Impacts on Groundwater <br />• <br />2.05-222 Revised November 2004 PR/0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.