Doc Date
7/30/2007
Section_Exhibit Name
Tab 14 Reclamation Plan
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. Access Road 1 will be backfilled and graded. The original road cut was below <br />sections of nearly vertical rock faces. Fill on this road will begin near the <br />center of the road and extend to a height of approximately 15' leaving some <br />vertical rock faces. Care will be taken when filling this area to use the best <br />soils for final cover. Excess material from this area will be used to construct a <br />new access road to the upper buildings. The new road will be west of <br />reclaimed Access Road 1. Additional material, if needed, will be hauled in <br />from the Unit Train Loadout Area. <br />Regrading of the lower area and the preparation plant will begin with clean-up <br />of refuse and coal stockpiles. All exposed coal residue or coal waste will be <br />placed in the CRDA-1. Concrete and other non-toxic material remaining after <br />demolition of the wash plant, shop and reclaim tunnel will be utilized to <br />construct the new access road and backfill a portion of Pond 8. Additional <br />soils will be graded over this fill to establish the final contours shown on <br />Exhibit 6C. Again, topsoil was not salvaged for this area, so some of the best <br />available soil in this area will be used as the final cover. <br />Reclamation of this area will include Haul Road 1. The 9.5' diameter conveyor <br />culvert under this area Leading under the highway was left in place. The <br />conveyor culvert was demolished and backiilled where it emerged from the <br />ground west of the I-70 frontage road. A minimum of 100-feet of culvert was <br />filled with soil. The 4-inch diameter mine dewatering pipe which ran through <br />the conveyor culvert to ouffall 001 was abandoned. <br />The drainage plan for the South Portal is shown on Exhibits 6C and 26. Run- <br />off calculations are presented in Appendix 14-6, pages 14-6-1 through 14-6- <br />18xxiii. The drainage ditches will be constructed except where they cross <br />pond 8 and pond 9. Pond 8 will receive interim run-off from ditch segments E, <br />F and G. Pond 9 will receive interim run-off from the RSRDA upper diversion <br />ditch, segments A, B and C, and a portion of the lower bench of the RSRDA. <br />The ditches will temporarily discharge into the two ponds to provide <br />sedimentation control until their removal is approved by the DMG. Once pond <br />removal is approved, the ditches will be constructed "through" the reclaimed <br />ponds so the final drainage configuration is complete. Ditch section H-H' will <br />be constructed after pond removal is approved. <br />Miscellaneous grading for the sfte will be at the A substation, Light Use Road <br />1, and the Water tank shown on Exhibit 6A, Tab Section 13. Grading of these <br />sites will involve minor cuts and fills to blend in with adjacent surface contours. <br />B-Substation was removed and the area graded during 2002. <br />• PR-3 14-8 (Rev. 1/07) <br />