2.05 Operation and Reclamation Plans Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
they will be gouted from the bottom to the top to stabilize them in the hole. In order to hang the power cables in <br />the holes, a steel structure will be constructed over two or three of the cased holes (the additional holes borings aze <br />discussed in the following paragaph). The structure wilt consist of steel beams supported on legs bolted to a <br />concrete footer. The beams will be either 10 (up to three) or 14 (one each) feet in length, and the legs will be <br />approximately 6.5 or 8 feet high. The footers will be approximately 4 x 4 x 4 feet. The 14-foot beam structures <br />will be placed over the 24-inch borehole. Also, a 7 x 10 x 0.3 foot pad will be poured around the 24-inch borehole. <br />The ] 0-foot beam structures will be placed over the 6-inch diameter borings. A 7 x 6 x 0.3 foot pad will be poured <br />azound these borings. <br />As part of the utility installation described above, TCC will advance up to three additional 6-inch cased borings at <br />the existing NMD Power Borehole. This is required due to problems encountered in gouting the casings as <br />approved in TR 00-37. These borings will be located on the same pad as the NMD Power Borehole, as they will <br />terminate in the same entry undergound as the NMD Power Borehole. During boring of the holes, the existing <br />mud pit will be utilized, although it will require that it be dug out and reestablished at the site. It is in the same <br />location as it was originally located. When the borings are completed, the pit will be backfilled and the pad gaded <br />as previously described. <br />6-North Mains Substation No. 14 (MROS-2011 <br />The proposed substation installation will consist of six concrete pads, including five designed to support <br />transformers. The sixth pad will be a foundation fora 14 x 30 foot prefabricated metal building, containing <br />electrical controllers and switch-geaz. A buried ground-bed, adjacent to the substation will complete the substation <br />installation. The proposed substation will be enclosed by a 120 x 110 foot, 8-foot high chain-link fence. The <br />substation location is shown on Map 24. Substation details and a materials list, are included in Exhibit 49E. <br />It is important to note that TROS-48 (6-North Mains Shaft and Associated Ancillary Equipment and Facilities) <br />addresses the construction, operation, and reclamation of the 6-North Mains ventilation shaft and associated <br />• ancillary equipment and facilities for TCC's Northern Mining District. TROS-4$ addresses road construction, <br />extension of a 69Kv power-distribution line from the existing substation at the Northwest Mains ventilation shaft, <br />construction of the ventilation shaft and utilities pad, shaft boring and lining operations, and the potential associated <br />impacts and controUmitigation/reclamation measures. Details for the undergound utility components for the 6- <br />North Mains shaft and Substation No. 14 are addressed in both the TROS-48 and MROS-198 (6-North Mains Utility <br />Boreholes) submittals, and are shown on the related Maps 23, and EX16E-M1 and M2. <br />Mine Water Recvclin8 Svstem -Fish Creek Borehole (MR 02-1791 <br />TCC is planning to construct a mine water recycling line from the Fish Creek t3orehote ponds that will tie into the <br />Escape Shaft and 10-Right undergound waterline. The location of the line and associated facilities is shown on <br />Map 24, Surface Facilities. The water line will further improve TCC's mine water recycling program and minimize <br />the volume of water that has to be imported from outside the mine for dust control . <br />Installation of the recycling system will require the following activities: 1) Installation of a pumping system at Fish <br />Creek Borehole facility, 2) Electrical and control system modifications, 3) Installation of a waterline from the <br />western settling cell to the Escape Shaft and 10-Right waterline, 4) tie-in of the waterline from the pond to the <br />escape shaft and ]0-Right waterline, and 5) Installation of manholes along the waterline for installing "T's" for <br />stock-tank feeds. <br />Installation of the pumping system will require construction of a concrete pad as a foundation for the pump and <br />control building. The pad will slope towards the cell, or a drain pipe maybe installed, so that any runoff from the <br />pad will drain to the cell. A suction line from the pump will be placed in the western settling cell for pumping of <br />the water up to the Escape Shaft or 10-Right waterline. The existing water treatment system will continue to <br />function, in order to provide acceptable quality water for use in the undergound mine dust suppression system. <br />The discharge line from the pump will be placed over the cell embankment and then buried and tied-in to the <br />MR06-207 2.05-65.3 04/25/06 <br />