Laserfiche WebLink
-3- <br />detemrined: <br />b) The Board will enter the lands to perform reclamation only if the Board has <br />i. that reclanration retlaired by law to have bey performed upar such lands has <br />not been performed, and <br />ii. that financial warranty forfeiture proceedings described in the Act or similar <br />provisions of subsequerrt laws, if any, gave bear initiated. <br />c) The Division, acting for the Boazd, will eater lands to respond to an emergency only <br />where the Division determures that any of the conditions of Construction Material Rule 8.4.2. exist. <br />~ The additional conditions set forth in the attached rider, if any, are incorporated herein by <br />reference. <br />/ / a) Rider is attached. <br />/ XX / b) No rider is attached. <br />MIIVED LAND RECLAMATION BOARD <br />COLORADO DEPARTMENT OF NATURAL RESOURCES <br />(///~~,y~,4~C <br />ONALD W. CATTANY <br />Divisiar Director <br />