My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE59120
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE59120
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:01:26 PM
Creation date
11/20/2007 6:09:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004031
IBM Index Class Name
Permit File
Doc Date
5/3/2004
Doc Name
Application (1st Half)
From
Aggregate Industries - WCR Inc.
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(~ A description of <br />(i) final grading -maximum anticipated slope gradient or expected ranges thereof,• <br />Disturbed azeas shall be regraded and smoothed to a finished grade suitable for <br />revegetation (3:1 slope below high water line). <br />(ii) seeding -types, mixtures, quantities and expected times of seeding and planting; <br />Please refer to the Reclamation Plan for a Plant and Seed Mix List. The operator will <br />seed during the appropriate season to assure adequate moisture for germination, and <br />implement weed control to ensure that grasses can establish. Plantings will be installed <br />adjacent to the river outside the sluny wall in conjunction with the Urban Drainage and <br />Flood Control Bank Stabilization Program. <br />(iii) fertilization -types, mixtures, quantities and time of application; <br />The type and application rate of fertilizer shall be determined based on a soil test at the <br />time of final reclamation. <br />(iv) revegetation -types of trees, shrubs, etc. <br />Because this is a lined reservoir, there will be no trees and shrubs planted within the <br />slurry wall. However, plantings will be installed adjacent to the river outside the slurry <br />wall in conjunction with the Urban Drainage and Flood Control Bank Stabilization <br />Program. A plant list has been provided on the reclamation plan. These native and <br />adapted shrubs will enhance the wildlife habitat by providing food and cover for resident <br />and migratory wildlife. <br />(v) topsoiling -anticipated minimum depth or range of depths for areas where topsoil will be <br />replaced. <br />Topsoil will be uniformly placed and spread on all azeas disturbed by the mining above <br />the anticipated high water line. The minimum thickness shall be 6 to 12 inches above the <br />surrounding finished grade. <br />AGGREGATE INDUSTRIES - HAZELTINE MINE MLRB I i2 PERMIT <br />
The URL can be used to link to this page
Your browser does not support the video tag.