Laserfiche WebLink
une Gxoundwatex sam lin G/19/03 <br />ul Groundwater sam lin 7/17/03 <br />Au st Groundwater sam lin 8/21/03 <br />Se tember Groundwater sam lin 9/18/03 <br />October Gxoundwatex sam lin 10/16/03 <br />November Gxoundwatex sam lin 11/20/03 <br />December Groundwater sam lin 12/18/03 <br />2004 <br />anua Groundwater sam lin 1/22/04 <br />Februa Gxoundwatex sam lin 2/19/04 <br />March Groundwater sam lin 3/18/03 <br />A ril Gxoundwatex sam lin 4/22/03 <br />Ma Groundwater sam lin 5/20/03 <br />une Groundwater sam lin 6/17/03 <br />ul Gxoundwatex sam lin 7/22/03 <br />Au ust Final baseline xoundwatex sam lin 8/19/03 <br />Se tember Scheduled start of minin o eradons <br />P:\Dan\GeN\F-S-P-T\ZN21\Penrvmng\Stipulauon Response\Cmundwaser Sampling Plan\Condiuon 1 Gmundwmr Sampling Plan 3_24_03.doc <br />