My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE59030
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE59030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:01:21 PM
Creation date
11/20/2007 6:06:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002004
IBM Index Class Name
Permit File
Doc Date
3/27/2003
Doc Name
Condition #1
From
GCC Rio Grande Inc
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SOP #: GW 0001 <br />Region I Low Stress <br />(Low Flow) SOP <br />Revision Number: 2 <br />Date: July 30, 1996 <br />Page 4 of 13 <br />G. Indicator field pparameter monitoring instruments - pH, Eh, <br />dissolved oxygen (DO), turbidity, specific conductance, and <br />temperature. Use of aflow-through-cell is requfired when measuring <br />all listed parameters, except turbidity. Standards to perform field <br />calibration of instruments. Analytical methods are listed in 40 CFR <br />136, 40 CFR 141, and SW-846. For Eh measurements, follow <br />manufacturer's instructions. <br />H. Decontamination supplies (for example, non-phosphate detergent, <br />distilled/deionized water, isopropyl alcohol, etc.). <br />I. Logbook(s), and other forms (for example, well purging forms). <br />J. Sample Bottles. <br />K. Sample preservation supplies (as required by the analytical <br />methods). <br />L. Sample tags or labels. <br />M. Well construction data, location map, field data from last <br />sampling event. <br />N. Well keys. <br />0. Site specific Sample and Analysis Plan/Quality Assurance Project <br />Plan. <br />P. PID or FID instrument (if appropriate) to detect VOCs for health <br />and safety purposes, and provide qualitative field evaluations. <br />III.PRELIMINARY SITE ACTIVITIES <br />Check well for security damage or evidence of tampering, record <br />pertinent observations. <br />Lay out sheet of clean polyethylene for monitoring and sampling <br />equipment. <br />Remove well cap and immediately measure VOCs at the rim of the well <br />with a PID or FID instrument and record the reading in the field <br />logbook. <br />If the well casing does not have a reference point (usually a V-cut <br />or indelible mark in the well casing), make one. Describe its <br />location and record the date of the mark in the logbook. <br />A synoptic water level measurement round should be performed (in the <br />shortest possible time) before any purging and sampling activities <br />begin. It is recommended that water level depth (to 0.01 ft.) and <br />
The URL can be used to link to this page
Your browser does not support the video tag.