Laserfiche WebLink
5.1.2 Supply Well DW-1. Cuxxentiy, supply well DW-1 is not active and does not have a <br />submersible pump, pidess unit, or power supply. As construction of the processing facility begins, <br />DW-1 will be put into service. Purging and sampling the well requires different sampling techniques <br />depending on if the well is operational (pump installed). <br />5.1.2.1 DW/-9 Sampling Protocol- Prior to Permanent Pump Installation. Supply Well <br />DW-1 is a 10 inch diameter well extending to a total depth of 624 feet and is screened <br />across the Dakota aquifer beginning at 514 feet (top). The static head in the well was <br />measured by Leonard Rice and Associates in January 2003 to be approximately 65 feet <br />below the ground surface. Because a large quandty.of water would be purged to <br />remove three full well volumes prior to sampling the well, the samplers will use the low <br />stress purging and sampling procedure fox the collection of groundwater from <br />monitoring wells developed by the U.S. Environmental Protection Agenry Region I <br />(EPA). Sampling by this method captures the water that flows through the well under <br />the natural (or near-natural) hydraulic gradient. A copy of the EPA procedure is <br />provided in Appendix A. <br />5.1.2.2 DW-1 Sampling Protocol-After Permanent Pump Installation. Once the well is <br />operational and producing water regularly, there will be no need to purge the well prior <br />to sampling. Following are the steps for sampling DW-1 when it is operational. <br />^ Measure the depth to groundwater from the top of the casing via air line <br />and/or transducer. <br />Record field water quality measurements in the field notebook. Field water <br />quality measurements include pH, SC/EC, and temperature. <br />Collect the groundwater sample upstream of the chlorination system at a <br />sample port and fill laboratory-prepared containers assigned to the well. <br />Once in place, the sample port will be inspected by DMG personnel to <br />determine if the port will need to be purged prior to sampling. This <br />sampling plan will be updated once the port is inspected by DMG. <br />Note and record pumping rate from the flow meter. <br />^ Submit the groundwater samples to an EPA-certified laboratory for analysis. <br />5.2 Field Observations <br />Collected sample water will be field-analyzed. Measurements, using portable in-stream meters (YSI or <br />comparable) following EPA-approved standard techniques and equipment calibration procedures, will <br />be made for pH, SC/EC, and temperature. Calibration for: pH and SC/EC will be completed at the <br />stazt of each day and recorded in the field notebook. <br />P:\Dam\GEN\F-S-P-T\22d31\PV+nltnng\SUpulauon Respome\Groundxarca Svnpling Plan\eondinon 1 Gwwdwarcr Svnpling Plan 3_U 03.doc <br />