Laserfiche WebLink
1 <br />6. Industrial Activity: Describe the primary industrial activities which take place on site. Include the type of facility (underground mino, surface mina <br />' etc.) plus a brief description of the nature of the business and the industrial processes used. Include a description of the mining and coal prepamfion <br />processes where applicable. (The applicant may want to submit a process flow sheet) <br />The Carbon Junction Mine is a reclahned surface coalmine that is wmntly in the CDMRS eztended tiabilitYperiod. <br />' 7. Indicate whether art exp[omtory, active mining, inactive mining, or post mining operation or is the site in temporary cessation. <br />The site h in frost reclamation Final reclamation was completed (n Aueust 2006. ADDrozhnately 33 of the 37 disturbed acres were reclaimed <br />' tremaktina area is the sedirrcent control system) Reveeetation took place m Aneust 2006 Both ontfells 001 and 002 serve total_h elclahned <br />areas Expected final bond release date. 2007. <br />t ff ezpMrotory, Please submit any known water quality/quantity data relative to the discharge(s) and the receiving stream(s) that reflect the conditions <br />prior to the present activity, the length of time the activity is expected to be under exploration and describe what activities will take place during <br />exploration that could have an unpact on the quantity or ffie quality of the discharge. If post mroiug, describe areas affected roil extent of reclamation <br />' completed and length oftime elapsed since revegetation occurred. Also, specify whether any outfalis previously described serve, partially or totally, a <br />reclaimed area. Include expected bond release date. <br />' 8, Production: List the principal product(s) produced and cumnt and maximum production rates. <br />Coal was Ore DrinaDal DroduM Dredeced from the CarboD Junction Mina There is no camnt Drodaclion. No sastamed lone term <br />aroduction occurred durina the life o[ the mina therefore there was no established maximum Droduction rate. <br />9. 1s this a seasonal operation? No X Yes [f Y~4e. please list the moDtbs of operotioa <br />' 10. Intermittent Discharges: Except for storm mnoff, are any of the discharges described in item 21 intermittent or seasonal? <br />No Yes If ~ describe the fregaenry, duration aDd flow rate of each discharge occamnce. <br />' Not ADn$cable. Smrm runoff only. <br />11. Location Map: A 8;a z 11 inch location map designating the facility property, intake points, discharge points, each of its haurdous waste treatment <br />' storage or disposal facilities, areas in poet misting, each web where fluids from the facility are injected underground, those webs, springs, other surface <br />water bodies and drirrking water wells listed in public records or otherwise known to the applicant and the receiving waters sha0 be submitted. The rnap <br />sha8 extend one mile beyond the property boundaries. The reap shall be from a 7~, or 15 minute USGS quad sheet, or a map of comparable scale. A <br />north arrow shall be shown. A larger map may be included for reference if the permittee wishes. <br />' THEMAP MUST HE ONPAPElt$~lX II HJCtrE.40R PROLE&SNG OF YOURPS@MIT wD.LBSDSLAY&D. See Attached LOCfltIOn MffD <br />12. Site Map: A 8;s z 11 inch map of the site sha0 be submitted showing facility features (whenever possible) such as buildings, ponds, diversion ditches, <br />' stream locations, numbered discharge pointy, sampling and flow monitoring points, land application areas, stockpiles, waste rock piles, topsoil piles, <br />location of trench drains and/or spoils springs, crusher areas, mine drainage flow paths, domestic wastewater treatment plants, power plants, truck <br />washing areas, explosive storage areas, parking lots, vehicle maintenance areas, chemical storage areas, etc. The outfalls shall fx labeled to correspond <br />' with the numbers Gated in item 21. A larger map may be included for reference if the pemtittee wishes. <br />THE MAP MOST HS ON PAPER$;aX 11 INCItES OR PROCIL43ING OF YOT7R PERMIT wII.L BE DELAYED. See Attached S(te MeD <br />' 13. Water Balance: Attach a line drawing showing all water flow through and from the mineJprepamtion plant sites. Indicate sources of intake water, <br />operations contributing wastewater m the effiuent, and treatment units labeled to correspond to the more detailed descriptions in item 21. Construct a <br />water balance on the line drawing by showing average flows behveen intakes, operations, treatment unit and outfalls. If a water balance cannot be <br />determined, provide a pictorial description of the nature and amount of any sources of water and any co0ection or treatment measures. 1f not appGcablq <br />' please indicate. <br />Not AnDticabla No Draws water used <br />1 <br />