<br />6. Industrial Activity: Describe the primary industrial activities which take place on site. Include the type of facility (underground mino, surface mina
<br />' etc.) plus a brief description of the nature of the business and the industrial processes used. Include a description of the mining and coal prepamfion
<br />processes where applicable. (The applicant may want to submit a process flow sheet)
<br />The Carbon Junction Mine is a reclahned surface coalmine that is wmntly in the CDMRS eztended tiabilitYperiod.
<br />' 7. Indicate whether art exp[omtory, active mining, inactive mining, or post mining operation or is the site in temporary cessation.
<br />The site h in frost reclamation Final reclamation was completed (n Aueust 2006. ADDrozhnately 33 of the 37 disturbed acres were reclaimed
<br />' tremaktina area is the sedirrcent control system) Reveeetation took place m Aneust 2006 Both ontfells 001 and 002 serve total_h elclahned
<br />areas Expected final bond release date. 2007.
<br />t ff ezpMrotory, Please submit any known water quality/quantity data relative to the discharge(s) and the receiving stream(s) that reflect the conditions
<br />prior to the present activity, the length of time the activity is expected to be under exploration and describe what activities will take place during
<br />exploration that could have an unpact on the quantity or ffie quality of the discharge. If post mroiug, describe areas affected roil extent of reclamation
<br />' completed and length oftime elapsed since revegetation occurred. Also, specify whether any outfalis previously described serve, partially or totally, a
<br />reclaimed area. Include expected bond release date.
<br />' 8, Production: List the principal product(s) produced and cumnt and maximum production rates.
<br />Coal was Ore DrinaDal DroduM Dredeced from the CarboD Junction Mina There is no camnt Drodaclion. No sastamed lone term
<br />aroduction occurred durina the life o[ the mina therefore there was no established maximum Droduction rate.
<br />9. 1s this a seasonal operation? No X Yes [f Y~4e. please list the moDtbs of operotioa
<br />' 10. Intermittent Discharges: Except for storm mnoff, are any of the discharges described in item 21 intermittent or seasonal?
<br />No Yes If ~ describe the fregaenry, duration aDd flow rate of each discharge occamnce.
<br />' Not ADn$cable. Smrm runoff only.
<br />11. Location Map: A 8;a z 11 inch location map designating the facility property, intake points, discharge points, each of its haurdous waste treatment
<br />' storage or disposal facilities, areas in poet misting, each web where fluids from the facility are injected underground, those webs, springs, other surface
<br />water bodies and drirrking water wells listed in public records or otherwise known to the applicant and the receiving waters sha0 be submitted. The rnap
<br />sha8 extend one mile beyond the property boundaries. The reap shall be from a 7~, or 15 minute USGS quad sheet, or a map of comparable scale. A
<br />north arrow shall be shown. A larger map may be included for reference if the permittee wishes.
<br />' THEMAP MUST HE ONPAPElt$~lX II HJCtrE.40R PROLE&SNG OF YOURPS@MIT wD.LBSDSLAY&D. See Attached LOCfltIOn MffD
<br />12. Site Map: A 8;s z 11 inch map of the site sha0 be submitted showing facility features (whenever possible) such as buildings, ponds, diversion ditches,
<br />' stream locations, numbered discharge pointy, sampling and flow monitoring points, land application areas, stockpiles, waste rock piles, topsoil piles,
<br />location of trench drains and/or spoils springs, crusher areas, mine drainage flow paths, domestic wastewater treatment plants, power plants, truck
<br />washing areas, explosive storage areas, parking lots, vehicle maintenance areas, chemical storage areas, etc. The outfalls shall fx labeled to correspond
<br />' with the numbers Gated in item 21. A larger map may be included for reference if the pemtittee wishes.
<br />THE MAP MOST HS ON PAPER$;aX 11 INCItES OR PROCIL43ING OF YOT7R PERMIT wII.L BE DELAYED. See Attached S(te MeD
<br />' 13. Water Balance: Attach a line drawing showing all water flow through and from the mineJprepamtion plant sites. Indicate sources of intake water,
<br />operations contributing wastewater m the effiuent, and treatment units labeled to correspond to the more detailed descriptions in item 21. Construct a
<br />water balance on the line drawing by showing average flows behveen intakes, operations, treatment unit and outfalls. If a water balance cannot be
<br />determined, provide a pictorial description of the nature and amount of any sources of water and any co0ection or treatment measures. 1f not appGcablq
<br />' please indicate.
<br />Not AnDticabla No Draws water used
<br />1