My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-07-30_PERMIT FILE - M2002052 (5)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2002052
>
2002-07-30_PERMIT FILE - M2002052 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2023 10:24:17 AM
Creation date
11/20/2007 6:04:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002052
IBM Index Class Name
Permit File
Doc Date
7/30/2002
Doc Name
COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PUMPING WORK <br />Task no.: 002 <br />Date : 07/17/2002 <br />User: KAP <br /> <br />State :Colorado PermiUjob no. : M-2002-052 <br />County :Weld _ Abbreviation :none <br />Site :Two Rivers Pit Filename :M052-002 <br />Agency or organization name Colorado Division Of Minerals And Geology _ <br />Permit or other job action :Permit Application <br />Task description : Dewater pit for grading and liner construction <br />HOURLY EQUIPMENT COST <br />Suction hose <br />>charge hose <br />Labor <br />Cost Breakdown <br />Ownership cosUhour <br />Operating cosUhour <br />Operator cost/hour <br />TotalcosUhour <br />n hose, 6 in. diam., 20 ft. L <br />urge hose. 6 in. D, 50 R. L _ <br />Operator <br />Job Utilization <br />$4.98 _ NA <br />$16.97 100 <br />$27.60 NA <br />2 <br />4 <br />2 <br />1 <br />Data <br />I Source <br />Job shift basis : 3 per day <br />Horsepower : 65 <br />Weight (UST) : 1.05 <br /> Total fleetcosUhour: $49.55 <br /> <br />PUMPING QUANTITIES <br />Initial pond Conversion Final pond <br />volume: 138,500,000.00 gallons factor : 1.0000 volume: 138,500,000 gallons <br /> <br />Total pond inflow surface Unit inflow rate in Total pond inflow volume <br />area : 78,200 sq. ft. gph/sq. ft. : 0.3516 per hour : 27,495.12 gph <br /> <br />Source of volume estimate :25 acre pond @ 17' deep; inflow surface area = 4600' pit pedmeter, lower 17' wetted <br /> <br />PUMPING TIME <br />Rated pump capacity : 90,000 gph/pump Total pumping capacity : 180,000 gph <br /> Initial unadjusted pumping time : 769.44 hours <br />Inflow as % of pond volume : NA % Inflow during initial pumping timt 21,155,967 gallons <br /> Net unadjusted pumping time : 886.98 hours <br /> <br /> Pump efficiency factor : 0.9167 (55 min./hr) <br /> Total adjusted pumping time : 967.58 hours <br /> <br />JOB TIME AND COST <br /> Total job time : 987.58 hours <br />Unit cost : $0.000300 per gallon Total job cost : $47,948 <br />
The URL can be used to link to this page
Your browser does not support the video tag.