My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-07-30_PERMIT FILE - M2002052 (5)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2002052
>
2002-07-30_PERMIT FILE - M2002052 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2023 10:24:17 AM
Creation date
11/20/2007 6:04:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002052
IBM Index Class Name
Permit File
Doc Date
7/30/2002
Doc Name
COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 006 State :Colorado <br />Date : 07/22/2002 County :Weld <br />User : KAP Site :Iwo Rivers Pit <br />Agency or organization name :Colorado Division Of Minerals And <br />Permit or other job action :Permit Application <br />Task description :Grade tgpS01/ <br />HOURLY EQUIPMENT COST <br />PermiUjob# : M-2002-052 <br />Abbreviation :none <br />Filename : M052-006 <br />Basic machine :Cat D8R - 8SU Horsepower : 305 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cah Shift basis : 1 per day <br />Attachment no. 2 :NA <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $42.20 NA <br />Operating cosUhour : $61.31 100 <br />Ripper op.cost/hour : $0.00 NA <br />Operator cosVhour : $30.65 i NA <br />Total unit cosUhour : $134.16 Total fleet cosUhour : $134.16 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 12,100 LCY !actor : NA volume : 12,100 LCY <br />Source of estimated volume :reclamation plan <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job Condition Cortection Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 200 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted howdy production : 491.9 LCYihr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shiR/da~ <br />Consolidated stockpile Spoil pile : 0.80 (Ind-rn <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 4, 730 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2, 550 Ibs/LCY Net correction : 0.45 <br />Weight description <br />Earth -Dry packed Adjusted unit production : 220.87 LCYihr <br /> Adjusted fleet production : 220.87 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 54.78 Hours <br />Unit cost : $0.607 /LCY Total job cost : $7,350 <br />
The URL can be used to link to this page
Your browser does not support the video tag.