My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-07-30_PERMIT FILE - M2002052 (5)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2002052
>
2002-07-30_PERMIT FILE - M2002052 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2023 10:24:17 AM
Creation date
11/20/2007 6:04:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002052
IBM Index Class Name
Permit File
Doc Date
7/30/2002
Doc Name
COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PUMPING WORK <br />PROJECT IDENTIFICATION <br />Task no.: 002 <br />Date : 07/17/2002 <br />User : KAP <br />State :Colorado <br />County :Weld <br />Site : Twa Rivers Plt <br />Permit/job no.:M-2002-052 <br />Abbreviation :none <br />Filename : M052-002 <br />Agency or organization name Colorado Division Ol Minerals And Geology <br />Permit or other job action :Permit Application <br />Task description :Dewater pit forgrading and liner construction <br />HOURLY EQUIPMENT COST <br /> <br />~iDescription <br />Quantity Data <br />Source <br />Pump : Centrifugal pump, 4.0 in. 2 (CRG) <br />Suction hose : Suction hose, 4 in. tliam., 25 R. L 4 (CRG) <br />Discharge hose : Discharge hose, 4 in. D, 50 R. L 2 (CRG) <br />Labor1Pump Operator 1 (CCA/RSM) <br />Cost Breakdown : Job Utilization <br />OwnershipcosUhour: $3.75 NA <br />Operating cost/hour : $13.44 100 <br />Operator cosUhour : $27.60 NA <br />Total cost/hour : 544. BO <br />TotalfleetcosUhour <br />PUMPING QUANTITIES <br />Initial pond <br />volume : 138,500,000.00 gallons <br />Total pond inflow surface <br />area : 78, 200 sq. ft. <br />Conversion <br />factor : 1.0000 <br />Unit inflow rate in <br />gph/sq. ft.: 0.3516 <br />Job shift basis : 3 per day <br />Horsepower: 45 <br />Weight (UST) : 0.70 <br />$44.80 <br />Final pond <br />volume: 138,500,000 gallons <br />Total pond inflow volume <br />per hour : 27, 495.12 <br />Source of volume estimate :25 acre pond @ 17' deep; inflow surface area = 4600' pit perimeter, lower 17' wetted <br />PUMPING TIME <br />Rated pump capacity : 40,000 gphlpump <br />Inflow as % of pond volume : NA <br />JOB TIME AND COST <br />Unit cost : $0.000611 per gallon <br />Total pumping capacity : 80,000 gph <br />Initial unadjusted pumping time : 1,731.25 hours <br />Inflow during initial pumping time 47,600,927 gallons <br />Net unadjusted pumping time : 2,326.26 hours <br /> <br />Pump efficiency (actor : 0.9167 (55 min./hr.) <br />Total adjusted pumping time : 2,537.65 hours <br /> <br />Total job time : 2537.65 hours <br />Total job cast : $113,882 <br />
The URL can be used to link to this page
Your browser does not support the video tag.