Laserfiche WebLink
1~ <br />KERR COAL COMPANY RECEIVED <br />KERR MINE <br />QUARTERLY SEDIMENTATION POND INSPECTION REPORT DEC Oj 19g9 <br />Pond A division of Minerals 8 Leo[ <br />Date 9-16-99 °9Y <br />1. Water Level (above or below dewatering orifice) Above_ Below X 1.5 Ft <br />2. Sediment Level [below dewatering orifice (designed sediment level)i 3.5 Et <br />3. Sediment Removal Required Yes No X <br />9. Outflow (depth of flow in weir) 0 Ft <br />5. Outflow 0 CFS <br /> PROBLEM <br />FEATURES <br />YES <br />NO CO[M~NTS <br />EROSION: <br />Rills s Gullies on Embankments <br />X <br />Wave Erosion X <br />Spillway Erosion X <br />Burrows X <br />Others X <br /> <br />STRUCTURAL: <br />Differential Settling <br />X <br />Cracks or Slides X <br />Seepage X <br />Other X <br /> <br />STRUCTURES: <br />Principal Spillway <br />Clogged Orifice <br /> <br />X <br />Clogged or Damaged Culvert X <br />Weir X <br />Emergency Spillway <br />Erosion <br />X <br />Riprap X <br /> <br />MAINTENANCE REQUIRED: None. <br />MAINTENANCE PERFORMED: None. <br />ADDITIONAL COMMENTS: Pond oversize due to previous sediment removal. <br />NAME OF INSPECTOR ~~' <br />\~~~`"" p RE6 <br />.~ F~ ~S <br />~~oOQ~PS E. (F~ <br />O, <br />U O t <br />~` ~59 / <br />SS~O N A~ <br />