My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO25920
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO25920
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:45:30 PM
Creation date
11/20/2007 6:03:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Hydrology
Doc Date
3/21/1996
Doc Name
PHONE CALL LOG FOR VIOLATION AND UPSET REPORTING
Permit Index Doc Type
CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
03/21/1996 12:13 303-782-0390 CDH W~CD WOCC PAGE 01 <br />III IIIIIIIII"I' III <br />Phone Call Log for Vloletlon end Upset Rspordng <br />Water Quality Control Division <br />Permits end Enforcement Section <br />Entity: Cyprus Yempe Valley Coel Co. <br />Permit No.: CO.0027154 Person Reporting: Karl Koehler <br />County:Routt Phone No.:18701870-2730 <br />Parameter: Total Suspended Solids Reported Value: 458 mg/I tTSSI <br />Total Recoverable Iron 12.6 mg/I tTRFe) <br />® Outfell 006 <br />Date of Violation: February 20, 1996 Permit Limit: 45 mg/1 tdafly max. TSSI <br />9;30 aH.,, 1.0 mgA (30-day avg.TRFe) <br />Date & Time of Report: 21 Mar. 98, 10:40 am Has this happened before: No <br />Probable Cause: This is a report of potential Upset and noncompliance. A culvert runs the <br />-60 yard distance from the pond outlet to the flume, where sampling occurs. On Feb. 19, <br />a relatively recently-installed HDPE water lino broke, causing sediment to wash into the <br />culvert and through the sampling point. The cause of the break is unknown, but they <br />suspect faulty installation, possibly a weld failure. It is under investigation. <br />Written Report to Follow: Yes <br />Comment: Feb. 13 and March 4 samples showed compliance. The 'Upset" was not <br />reported earlier because the association was not made and the impact of the line break <br />not known until sample results were received and reviewed. <br />Recorded By: Kathleen Sullivan <br />Date: March 21, 1998 <br />cc- K(Int Oorh~m, DMO <br />Dl~blet EnplnNr, Fldd Support Srction <br />Orlelnal to MS-3 FN <br />
The URL can be used to link to this page
Your browser does not support the video tag.