My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO25918
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO25918
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:45:30 PM
Creation date
11/20/2007 6:03:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
Hydrology
Doc Date
11/18/2004
Doc Name
3rd Quarter 2004 Stockpond Inspections
From
Seneca Coal Company
To
DMG
Permit Index Doc Type
Sediment Pond Inspections
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERIODIC INSPECTION FORM <br />Stockponds or Sumps <br />INSPECTOR'S NAME: Roy Karo <br />FACILITY CONFIGURATION: Stockpond <br />SITE NAME: T-22 <br />MINE NAME: Seneca II-W <br />MINE I.D. NO.: C-62-057 <br />DATE: V /~~/ a/ <br />DATE LAST INSPECTION: <br />LOCATION: SE~,SW ,, Sec 10, TS N, RSSW <br />LOCATION: 8 mi S of Hayden, CO <br />OWNER'S REP.: Gregg Kitchen Gen.Mgr. <br />Circle or write in appropriate response <br />1. Angle of slope: 3.5:1 upstream, 2.5:1 downstream <br />2. *Seepage (specify location, color, and approximate volume) <br />At isolated points on embankment slopes: <br />At natural hillside: <br />Over widespread areas: <br />From downstream foundation area: <br />"Boils" beneath stream or ponded water: <br />3. Cracks or scarps on crest: <br />4, Cracks or scarps on slope: <br />5, Sloughing or bulging on slope: <br />6, *Major erosion problems: <br />7. Surface movements in valley bottom or on hillside: <br />8. *Erosion of toe: <br />9. *Water impounded against downstream toe: <br />10. Existing embankment freeboard: <br />11. Increase Decrease in water level: <br />12. Cracks, bulging, or erosion on upstream face: <br />13. Spillway erosion: <br />14. *Clogging <br />Spillway channels: <br />Diversion ditches: <br />N/A <br />N/A <br />Yes No N/A <br />Yes No N/A <br />*Major adverse changes in these items could cause instability and should be reported to <br />the Engineering Manager and Mine Superintendent for further evaluation. Adverse <br />conditions noted in these items should normally be described (extent, location, volume, <br />etc.) in the space on the back of this sheet. <br />Comments: S~liv(~if/~ G'(~1}NE~ aK% <br />~~.~~, <br />Total = 6:1 <br />Yes No <br />Yes No <br />Yes No <br />Yes No <br />Yes No <br />Yes No <br />Yes No <br />Yes No <br />Yes No <br />Yes No <br />Yes No <br />Yes No <br />feet <br />Peet <br />Yes No <br />Yes No <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />[yL SP/c c N7K1y 1~ / ^/ LC~T <br />53 <br />
The URL can be used to link to this page
Your browser does not support the video tag.