Laserfiche WebLink
July 18. 1978 <br />Hr. Charles Hevereaua <br />925 - 7th Street <br />Meeker, Colo. 81641 <br />BB: K-Bar-T Pit 878-221 <br />Dear Hr. Devereaux: <br />Belaor are the questions that need to be ane~rered by July 2~, 1378 <br />in order for me to present this application to the Board at fire <br />July 26-27 Boazd meeting. <br />I. Bxitibit B - Mining Plan <br />Moat is the estimated depth of t:ie gravel? <br />(tale can b:: given as ranges in depth) <br />Ii. cx:iii,it ~ - ;eclamatio~i Pfau <br />;t. lTiat is tae maximum anticipated Slope graoiant? Is <br />tail final grade approximately tae same as fire hill <br />gradient before mining? <br />B. What thickness of topsoil will be spread over tae area <br />after miaingT (Can be given as ranges ia: t:~icnieaa) <br />C. Will seed be drilled or broadcast? Tae staff r_cu;.;:,x;nde <br />that seed be drilled. <br />D. Seed mixture. <br />1. The staff recommends a ma:imum rate of 1 pound <br />pare live •eed per acre oP yellw swaetclover <br />bscaase at higher seed rates yellow swaaeclover <br />outcompatas grasses and becomes dominaat oa the <br />site. <br /> <br /> <br /> <br />