Laserfiche WebLink
• III IIIIIIIIIIIII III • <br />999 <br />STATE OF COLORADO <br />OFFICE OF THE STATE ENGINEER <br />Division of Water Resources <br />Department of Natural Resources <br />1313 Sherman Street, Room 818 <br />Denver, Colorado 80203 <br />Phone: 1303) 866-3581 <br />FAX: 13031866-3589 <br />http //waterstale.co.us/de(aul[.htm <br />RECEIVED <br />MAR 2 0 2001 <br />Division of Minerals and GeBlogy <br />Response to Reclamation Permit Application Consideration <br />TO: Carl B. Mount, Senior Environmental Protection Specialist <br />CC: Division 1 Office; District 49 Water Commissioner <br />FROM: Claudia Engelmann, Water Resource Engineer G~ <br />DATE: March 20, 2001 <br />RE: Schumacher II Pit, File No. M-2001-018 <br />Section 11, Twp 11 N, Rng 52 W, 6th P.M., Logan County <br />Operator: Nienhueser Construction and Excavating Co. <br />Contact: Keith Nienhueser, Vice President <br />Nienhueser Construction and Excavating Co. <br />P.O. Box 173 <br />Sidney, NE 69162 <br />(308)254-3453 <br />oF.~O~a <br />ti~ a <br />~~ <br />,~. <br />4 <br />' ~ 19'I6 <br />B~II Owens <br />Governor <br />Greg E. Watcher <br />Executive Director <br />Hal D. Simpwn, P.E. <br />Stale Engineer <br />CONDITIONS FOR APPROVAL <br />® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of <br />ground water must not occur during or after mining operations. <br />^ The proposed operation will consume ground water by: ^ evaporation, ^ dust control, ^ <br />reclamation, ^ water removed in the mined product, ^ processing, ^ other <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a <br />gravel pit or other type of well permit, as applicable. However, prior to obtaining a permit, <br />an approved water supply plan or decreed plan for augmentation is required. <br />^ Prior to approving a well permit, the applicant must conduct a field inspection of the site and <br />document the locations of all wells within 600 feet of the permit area. The applicant must <br />then obtain a waiver of objection from all well owners with wells within 600 feet of the permit <br />area or request a hearing before the State Engineer. <br />^ Other: <br />COMMENTS/NOTES: <br />