Laserfiche WebLink
• TOC-2 <br />3.0 Reclamation ................................................... 3-1 <br />3.1 Post Mining Topography .................................... 3-3 <br />3.2 Topsoil Removal and Storage ................................ 3-4 <br /> 3.2.1 Depths and Suitable Topsoil Available for Reclamation .... 3-4 <br /> 3.2.2 Volumes of Topsoil Available for Reclamation ........ .... 3-5 <br /> 3.2.3 Topsoil Storage ............................... .... 3-5 <br />3.3 Backfilling and Grading ................................. .... 3-6 <br /> 3.3.1 Backfilling and Grading -Lower Road .............. .... 3-6 <br /> 3.3.2 Backfilling and Grading -Upper Road .............. .... 3-7 <br /> 3.3.3 Backfilling and Grading -Mine Site ................ ... 3-11 <br /> 3.3.4 Reclaimed Ephemeral Channels .................. ... 3-14 <br /> 3.3.5 Backfilling and Grading -Loma Loadout ............ ... 3-16 <br />3.4 Surface Preparation Topsoil Placement .................... ... 3-16 <br />3.5 Revegetation Practices ................................. ... 3-17 <br /> 3.5.1 Seedbed Preparation ........................... .:. 3-17 <br /> 3.5.2 Seed Mixture ................................. ... 3-17 <br />• 3.5.3 Seeding Techniques and Rates ................... ... 3-18 <br /> 3.5.4 Mulching .................................... ...3-18 <br /> 3.5.5 Planting Times ................................ ... 3-18 <br /> 3.5.6 Irrigation and Fertilization ....................... ... 3-18 <br />3.6 Protection of Newly Seeded and Planted Areas .............. ... 3-19 <br />3.7 Prevention of Public Hazards ............................ ... 3-20 <br />3.8 Reclamation Schedule and Costs ......................... ... 3-20 <br />3.9 Evaluation Techniques for Revegetation .................... ... 3-21 <br />• M" 9/03 <br />