Laserfiche WebLink
i11 iii~~~il~ii«ul <br />DEPARTMENT OF NATURAL RESOURCES <br />MINED LAND RECLAMATION DIVISION <br />DAVID C. SHELTON, Director <br />February 12, 1987 <br />Ed Loloff <br />Ed Lolaff Const Inc <br />145 Third St <br />Kersey, CO 80644 <br />Re: M-85-112 ED LOLOFF CONST INC, Permit Issuance <br />Dear Ed Loloff: <br /> <br />~~ <br />On February 04, 1987, the Mined Land Reclamation Division found E Loloff <br />Const Inc to have satisfied the applicable requirements of C.R.S. 34-32-101 et <br />important. <br />se for obtaining a mining and reclamation permit. Therefore, a permit is <br />bung issued. Two signed originals of the permit have been execu ed. We have <br />kept one copy for our files and are enclosing one copy for your u e. Please <br />read the terms of the permit. It is your responsibility to compl with all of <br />the terms of the permit. Asa reminder, here are a few things w feel are <br />with the terms of the permit. ; <br />1. All of the original application materials, as amended and su plemented, <br />are an integral part of your permit. They have been incorporate into the <br />permit by reference. We presume that you have a copy of all of he se <br />materials; therefore, none have been enclosed with this mailing. We suggest <br />that you keep a copy of the permit and the permit application at the mining <br />operation as a reference for operating personnel, to help ensur compliance <br />3. On your permit anniversary date each year, February 04, yo must submit an <br />annual fee and an annual report to us. The annual fee for thi permit is <br />E350.00. Please consult Rule 3.4 for 110 Permits, and Rule 2, for 112 <br />Permits, and Statute Section 34-32-116{1){a) for 111 Permits, for the specific <br />annual report requirements applicable to your mine. ~ <br />2. Changes in the mining and reclamation operations that differ from those <br />described in the permit may require a revision to the permit, a suggest <br />consulting the Minerals Rules and Regulations and/or contacting us to <br />determine if a revision to the permit is necessary. Rule 1.8 p rtains to <br />Amendments, Rule 1.9 to Technical Revisions, and Rule 1.10 to C nversions. <br />If you have any questions, please contact me. <br />Si ~cerely, ' <br />DAVID C. SHELTON ~ <br />Director i <br />