Laserfiche WebLink
<br />NWCC INC. <br />SEDIMENTATION POND & IMPOUNDMENT INSPECTION <br />Project ~~e.r Coy,[ Co. ~~'t~•-1y Fug 6r Cwp~ -W1 ccr+- Wl~r~x- <br />Project no. l.0 3 ~ I Field Engineer(s): (~ l~2-E-c ~ScM- ~ ~JYL 4.,., t.en- P <br />Site Name: doh d - Tipo~ e- Date: S'I~~OS <br />a <br />Water Level G~i Outflow: (Y N) Sediment Level: (,(,1/tM.w ~ < o~tkf <br />ITEM PROBLEMS OBSERVED COMMENTS <br />INSPECTED (circ(edj <br />UPSTREAM <br />SLOPE Rip Rap Wave erosion Cracks Sink hole ~QJ~ SCE <br />- <br />Z b <br />s <br /> epressio Bulges Steepness Slides r.~,~ <br />Oci <br />npsSib(c braver ac~'vr-l~y ? <br />1_ <br /> urrows Ve etation Concrete Livestock <br />CREST Ruts Erosion Cracks Sinkhole Width ~~ U`~iT°NCOYV <br /> Low Area SurfaceDraina e Other o <br />DOWNSTREAM Erosion Cracks Sinkhole Steepness <br />SLOPE <br /> Depression Bulges Slides Soft Areas <br /> Ve etation Livestock Burrows Other <br /> <br />SEEPAGE <br />Saturated Embankment Point Source ll 1 1 <br />~S Vw"i~ Ut.vl tf~ wtG~ <br />1 <br /> oe See a e Flow Near O <br />PRINCIPAL ~ Poor Operation Deterioration Conduit <br />OUTLET <br /> Joints Valves Other <br /> <br />EMERGENCY <br />Erosion Cracks ow Obstruct rr.. ,, ~ r~ L <br />Ill Ve5P7(~~ <br />SPILLWAY <br />Cdncrete Structure <br />II/tiIJS-m e~ <br />MONITORING Damage Vegetation Clogging Rust Ok <br />DNICES <br /> Other <br />OVERALL Satisfactory CondRionally Operational Unsatisfactory <br />CONDITIONS <br />ITEMS - f eIriIVG ~~wn~/y~ p,prn' .C~~~~IV~ <br />~ <br />- <br />"'~"'^, <br />RECOMMENDED V <br />1 <br />f I_ ~ <br />IYl'61'W"tU~ kJU'YYO~s <br />FORACTION <br />ACTION ITEMS <br />REQUIRED FOR r 1 <br /> <br />HEALTH & 0~ <br />/~j <br />SAFETY <br />