Laserfiche WebLink
I. TOPSOIL <br /> A. REMOVAL <br /> Maximum tons removed per day <br /> Tons removed per year <br /> Proposed controls for topsoil removal: (check appropriate boxes) <br /> ❑ Moist Material <br /> ❑ Water Spray <br /> ® Other (specify) TOPS IL WILL BE STOCKPILED FOR RECLAMIMATION <br /> ❑ No Control <br /> B. TOPSOIL STOCKPILE <br /> Maximum stored at one time tons. <br /> Maximum stored per year tons. <br /> Length of time pile remains undisturbed <br /> Proposed controls for topsoil stockpile: (check appropriate box) <br /> ❑ watering times/day, or continuous sprinkler (to <br /> maintain moist surface) . <br /> ❑ Chemical stabilizer Type: <br /> ❑ Compacting of piles, method <br /> ❑ Enclosures: complete, or paitial (check one) <br /> ❑ Revegetation, (Lengt of time till revegetation _) . <br /> ® Other (specify) REVE ATION WILL BE ONGOING AT -THE SAME TIME OF RECLAIMATION <br /> ❑ No control BEGINNING SEPTEMBER 1, 1996 <br /> II. OVERBURDEN <br /> A. REMOVAL <br /> Maximum tons removed per day <br /> Tons removed per year <br /> Equipment used for remove <br /> Proposed controls for overburden removal: (check appropriate boxes) <br /> ❑ Moist Material <br /> ❑ Water Spray <br /> Other (specify) LESS 1HAN 70,000 TONS OF GRAVEL WILL BE REMOVED ANNUALY <br /> ❑ No Control <br /> 2 <br />