Laserfiche WebLink
SNOWCAP COAL COMPANY <br />Cameo Refuse Disposal Area No. 2 Inspection - 4~' Quarter 2005 <br />On December 13, 2005, I performed the required quarterly visual inspection of the <br />Cameo Refuse Disposal Area No. 2 in accordance with Rule 4.10.2. <br />I, J. E. Stover, P.E., have a wide variety of experience in the design and construction of <br />earth fill embankments. Nothing was observed during the inspection that would indicate <br />the pile has a potential for failure. The pile was dry. No seepage was noted around the <br />pile. The upper diversion ditch was inspected with one small problem explained in the <br />required maintenance section below. The pile has been covered with the required 24 <br />inches of non-toxic material. <br />The pile is located in a remote area well away from human habitation. A failure of the <br />pile might damage the haul road and sediment pond located below the pile. However, <br />a failure of the pile would probably not be a hazard to human life. <br />I certify that to the best of my knowledge and belief, that the fill and other aspects of the <br />Cameo No. 2 refuse pile have been constructed as permitted in the design approved by <br />the DMG. <br />Recommended maintenance: Clean sediment from upper diver~s~` in a small <br />area located approximately 700 feet east of the west end ofe~fi®dY~p~~kfl~,p~sion ditch. <br />JacfiesE;~ver ~ ~,V~ Date <br />P.E. No. ~~ ,~: ~~e <br />~~~ <br />•~rFS`~O~oeco~°'~~U `0 <br />°o,®"3r~~y;~9~ <br />