My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO25891
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO25891
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:45:29 PM
Creation date
11/20/2007 6:01:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Hydrology
Doc Date
1/5/2006
Doc Name
4th Qtr 2005 Surface, Groundwater, Pond & Refuse Pile Report
From
J.E. Stover & Associates Inc
To
DMG
Permit Index Doc Type
Other Surface Water
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SNOWCAP COAL COMPANY <br />Cameo Refuse Disposal Area No. 1 Inspection - 4~' Quarter 2005 <br />On December 13, 2005, I performed the required quarterly visual inspection of the <br />Cameo Refuse Disposal Area No. 1 in accordance with Rule 4.10.2. <br />I, J. E. Stover, P.E., have a wide variety of experience in the design and construction of <br />earth fill embankments. Nothing was observed during the inspection that would indicate <br />the pile has a potential for failure. <br />The south under drain was dry. The entire pile was dry. No seepage was noted around <br />the pile. The upper diversion ditch and collection ditches were inspected with no <br />problems noted. <br />The access road to the pile, which is the west extension of Haul Road No. 5, remains <br />open to accept coal and refuse material from other reclamation activities. <br />The pile is located in a remote area well away from human habitation. A failure of the <br />pile might damage the haul road and sediment pond located below the pile. However, <br />a failure of the pile would probably not be a hazard to human life. <br />I certify that to the best of my knowledge and belief, that the fill and other aspects of the <br />Cameo No. 1 refuse pile have been constructed as permitted in the design approved by <br />the DMG. <br />~~~~n°~r~,~~ <br />Recommended maintenance: None ®°o`~n~~'" ~:'°°~°~PTa <br />Jame,~E. frier / ~ ~o° Date <br />P.E. No. 1,, ,°~ a° <br />O~~f °°c°°o ~°~~+ye~8 <br />aooid~t.g e u 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.