Laserfiche WebLink
SNOWCAP COAL COMPANY <br />Cameo Refuse Disposal Area No. 1 Inspection - 4~' Quarter 2005 <br />On December 13, 2005, I performed the required quarterly visual inspection of the <br />Cameo Refuse Disposal Area No. 1 in accordance with Rule 4.10.2. <br />I, J. E. Stover, P.E., have a wide variety of experience in the design and construction of <br />earth fill embankments. Nothing was observed during the inspection that would indicate <br />the pile has a potential for failure. <br />The south under drain was dry. The entire pile was dry. No seepage was noted around <br />the pile. The upper diversion ditch and collection ditches were inspected with no <br />problems noted. <br />The access road to the pile, which is the west extension of Haul Road No. 5, remains <br />open to accept coal and refuse material from other reclamation activities. <br />The pile is located in a remote area well away from human habitation. A failure of the <br />pile might damage the haul road and sediment pond located below the pile. However, <br />a failure of the pile would probably not be a hazard to human life. <br />I certify that to the best of my knowledge and belief, that the fill and other aspects of the <br />Cameo No. 1 refuse pile have been constructed as permitted in the design approved by <br />the DMG. <br />~~~~n°~r~,~~ <br />Recommended maintenance: None ®°o`~n~~'" ~:'°°~°~PTa <br />Jame,~E. frier / ~ ~o° Date <br />P.E. No. 1,, ,°~ a° <br />O~~f °°c°°o ~°~~+ye~8 <br />aooid~t.g e u 0 <br />