Laserfiche WebLink
1 <br /> 2. Subsequent to any topsoil removal and stockpiling, a front-end loader will <br /> grade-out a staging area where tandem and tractor-trailer trucks can be <br /> ' loaded with fill material, turn around, and exit the property. <br /> 3. Excavation will begin by a front-end loader excavating into the pre-existing <br /> ' cut-slope and will load fill material into trucks for export offsite. Excavation <br /> ' will proceed in this manner until all the fill material designated to be removed <br /> on the mine plan is removed. <br /> 1 4. Reclamation of the pit slopes will be concurrent with excavation, ensuring <br /> slopes are at least 2:1, topsoiled and revegetated. <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> ' 18 <br />