My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE58713
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE58713
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:00:59 PM
Creation date
11/20/2007 5:59:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
m1989065
IBM Index Class Name
Permit File
Doc Date
5/20/1996
Doc Name
Referral Request
From
Douglas County
Media Type
M
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br />I <br />1 <br />1 <br />1 <br />1 <br />1 <br />F <br />1 <br />EXHIBIT L <br />HALLETT MATERIALS COMPANY <br />WINKLER LIGHT AGGREGATE QUARRY <br />DOUGLAS COUNTY, COLORADO <br />MAJOR DISTURBANCE RECLAMATION COSTS <br />Descriptions: <br />Backfill Overburden <br />Crushed Stone <br />Cut Stone <br />Redistribute Topsoil <br />Crushed Stone <br />Cut Stone <br />Scarify Compacted Areas <br />20.0 Acres x 18" Depth <br />9.0 Acres x 18" Depth <br />20.0 Acres x 3" Depth <br />9.0 Acres x 3" Depth <br />1.0 Acre Topsoil Stockpiles <br />3.0 Acres Overburden Stockpiles <br />Seed, Fertilize, Mulch 16.0 Acres Mined <br />13.0 Acres Stripped <br />1.0 Acre Topsoil Stockpiles <br />3.0 Acres Overburden Stockpiles <br />Note: Quarry edges will be blasted at a 3:1 slope. <br />L -2 <br />11 <br />UNIT <br />NO. <br />ITEM <br />UNIT <br />QTY. <br />PRICE <br />TOTAL PRICE <br />1. <br />Backfill Overburden <br />C.Y. <br />70,180 <br />$ 1.00 <br />$ <br />70,180.00 <br />2. <br />Redistribute Topsoil <br />C.Y. <br />11,697 <br />$ 1.00 <br />S <br />11,697.00 <br />3. <br />Scarify Compacted Areas <br />Acre <br />4.0 <br />$725.00 <br />$ <br />2,900.00 <br />4. <br />Seed, Fertilize, Mulch <br />Acre <br />33.0 <br />$500.00 <br />$ <br />16,500.00 <br />TOTAL <br />$101,277.00 <br />Descriptions: <br />Backfill Overburden <br />Crushed Stone <br />Cut Stone <br />Redistribute Topsoil <br />Crushed Stone <br />Cut Stone <br />Scarify Compacted Areas <br />20.0 Acres x 18" Depth <br />9.0 Acres x 18" Depth <br />20.0 Acres x 3" Depth <br />9.0 Acres x 3" Depth <br />1.0 Acre Topsoil Stockpiles <br />3.0 Acres Overburden Stockpiles <br />Seed, Fertilize, Mulch 16.0 Acres Mined <br />13.0 Acres Stripped <br />1.0 Acre Topsoil Stockpiles <br />3.0 Acres Overburden Stockpiles <br />Note: Quarry edges will be blasted at a 3:1 slope. <br />L -2 <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.