Laserfiche WebLink
I <br />1 <br />' <br />Revegetation <br />' The reclamation plan will revegetate all <br />disturbed areas with <br />appropriate seed mixes to minimize <br />erosion, <br />re- establish natural <br />terrain and create usable rangeland. <br />Reseeding <br />of the property <br />will be done after topsoil is <br />replaced <br />in accordance with <br />' <br />accepted planting practices. Grass <br />mix will <br />be according to SCS <br />recommendations on the accompanying <br />Exhibit <br />E sheet. <br />I <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />All grass seeds will be planted with a grass drill equipped with <br />depth bands and press wheels. Seed will be planted approximately <br />one -half inch deep and will be drilled between November 1 and <br />April 1. The grass seed mix includes drought resistant varieties <br />and will be planted either in early spring or fall to insure <br />germination. <br />If a significant invasion of noxio <br />be mowed periodically for control. <br />reach a height of 6 to 12 inches <br />season. Mechanical control will <br />Chemical methods will only be <br />produces acceptable results. <br />as weeds occurs, the area will <br />Weeds will be mowed when they <br />throughout the first growing <br />be used as a first priority. <br />used if no other alterative <br />The property is not forested and will not require fire lanes. A <br />minimum 500 foot setback will be maintained around the permit <br />boundary which will allow access. As shown on the Mining Plan <br />map, this setback is substantially more than 500 feet in most <br />areas. <br />The reclamation of all processing sites will be delayed until the <br />final phase of mining is completed. At that time the ground will <br />be scarified, leveled, and seeded with grass. The location of <br />processing sites are intended to serve several phases of mining <br />before being moved. <br />No trees or shrubs will be planted for site revegetation. <br />E -6 <br />1 <br />