Laserfiche WebLink
I <br />1 <br />1 <br />1 <br />l <br />I <br />I <br />[] <br />1 <br />TABLE OF DISTURBANCE <br />Haior Disturbance <br />Mining, Crushed Stone <br />10.0 <br />Acres <br />Stripping, Crushed Stone <br />10.0 <br />Acres <br />Mining, Cut Stone <br />6.0 <br />Acres <br />Stripping, Cut Stone <br />3.0 <br />Acres <br />Topsoil Stockpiles <br />1.0 <br />Acres <br />Overburden Stockpiles <br />3.0 <br />Acres <br />Major Disturbance Subtotal 33.0 Acres <br />Moderate Disturbance <br />Plant Sites: <br />Crushing, Screening, Milling <br />7.0 <br />Acres <br />Concrete <br />4.0 <br />Acres <br />Asphalt <br />4.0 <br />Acres <br />Cut Stone <br />5.0 <br />Acres <br />Access Roads <br />8.0 <br />Acres <br />Office, Scale, and Washing <br />2.0 <br />Acres <br />Equipment Yard and Maintenance <br />2.0 <br />Acres <br />Moderate Disturbance Subtotal 32.0 Acres <br />Minor Disturbance <br />Seeding - Year 1 12.0 Acres- <br />Reseeding - Year 2 2.0 Acres <br />Minor Disturbance Subtotal 14.0 Acres <br />Total Disturbed Acreage 79.0 Acres <br />The mining timetable for this project is market dependent. The <br />total time for mining a ten acre parcel could range from 1 to 5 <br />years depending on the amount of material sold per year. <br />D -5 <br />