Laserfiche WebLink
<br /> <br />Mr. Gilbert F. Rindahl -2- December 12, 1983 <br />To this base cost, the operator must include the following: <br />Transport unscreened plant -growth medium to the screen before <br />replacement/stockpiling for future use = $.2U/cu.yd. <br />Screen the unscreened plant-growth mediwn = $.15/cu.yd. <br />Total: _ $.35/cu.yd. <br />$.35 x 25,000 cubic yards overburden = $ 8,750.00 <br />Ripping costs - $40/acre x 20 acres = $ 800.00 <br />Hauling/handling screened material @ $.20/cu.yd. <br />$.20 x 20,000 cubic yards after screening = $ 4,000.00 <br />Backsloping and random bench = $ 2,000.00 <br />Shrub and tree seedling procurement, <br />planting, and establishment = $ 298.00 <br />TUTAL: _ $ 15,848.00 <br />Additional topsoil needed to achieve the <br />reclamation plan = 11,000 cubic yards <br />$6 /cu.yd. topsoil delivered x 11,000 = $ 66,000.00 <br />TUTAL RECLAMATION COSTS = $118,804.96 <br />The staff will recommend that the Board increase the reclamation bond for this <br />site from $37,953.00 to $118.800.00. <br />Please feel free to contact me if there are any questions. <br />Sincerely, <br />James B. McArdle <br />Senior Reclamation Specialist <br />JBM/mmt <br />Doc. No. 7740 <br />