Laserfiche WebLink
<br />1 (54t \~t%arringt~rn Court Phone (3Q3) 34G-5196 P,ax; (363)-36.G-69"s4 <br />i'arker, Cf) I;SA R(113R F-(\~txil: le~;~icki'~<a%at[hi.eon~ <br />March 19, 2003 <br />Erica Crosby <br />Colorado Division of Minerals and Geology <br />1313 Sherman Street <br />Denver CO 80202 <br />RE~'F~V~®~ <br />fd?,p ~ C ~' r..~.1 <br />~.._J <br />Division o'r °j;;,ei _ls as . ~, -'~Y <br />RE: Adequacy responses for Fetcher/Vale Pit Elam Construction <br />Vol-2t~72-11~( <br />Dear Erica: <br />Enclosed are the adequacy responses to your letter of March 4, 2003 regarding the <br />Fetcher/Vale Pit of Elam Construction, Inc. Please replace existing pages of the <br />application with the enclosed pages. 1'he new pages for the Geotechnical Stability <br />Exhibit belong at the end of the application. Also, the Mine Plan Map has been <br />changed and is enclosed. <br />Sincerely, <br />~~ ~~ <br />Greg Lewicki, P. E. <br />Greg Lewicki and Associates <br />RECEIVED <br />MAR 2 S 2003 <br />Division of Minerals and Geology <br />cc: Steve Kaspar Elam Construction, Inc. <br />