Laserfiche WebLink
~i <br /> <br />46. F'UF:POSE <br />The er.cavated sand and gravel will be used for road base <br />and/or""fill, off site, for various construction projects. <br />4c. DISCHARGE OF DREDGED OR FILL h1ATERIAL <br />Material e::cavated with the front-end loader will be <br />loaded directly into trucks and hauled to various locations <br />offsite for use as road base and/or fill. The temporary <br />diversion structure in Phase II will be constructed with native <br />alluvium and is estimated to require 450 yd3. By allowing the <br />channel to remain within the Phase I e::cavated area during <br />Fhase II, stockpiles will not be needed for the operation. <br />The rip-rap to be used on the west slope ^f F'hase 1 is to <br />consist of angular rock and boulders appror.imately 2 ft r. 2 ft <br />in size. It will be acquired from construction projects E-- W~ ~~ <br />elsewhere. Appror.imately 2000 yd~ of rip-rap will 6e required w~(~ ,f-~e <br />and will be stockpiled on the property as it becomes available <br />s^ that it can be used during and at the completion of Phase I ~/`~j` <br />e;~cavati on. / <br />~~v~--- <br />7 <br />Page 3 (Application) <br />