My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE58596
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE58596
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:00:52 PM
Creation date
11/20/2007 5:56:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982155
IBM Index Class Name
Permit File
Doc Date
2/17/1978
Doc Name
REGULAR 112 PERMIT APPLICATION FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,..., <br />f For reclamation purposes, all elopes should ba reduced ae muei~ <br />as practicable with none steeper than about 3,5 to 1, This degree <br />~. of elope will accomodate the mechanical operation of tillage i:oole, <br />~' seeders, and mulchers, <br />Topsoil should be returned to the graded surfaces, seedbed pre <br />pared, and grass seed drilled, A mixture of 1 lb, blue grams and <br />Ir,$ ?bs, of aide-oats grams drilled in early spring is recommended, <br />The amounts stated are for pure live seed, not bulk, out of the rick, <br />maters al , <br />Hay mulch should be applied at the rate of about 2 tons per acre, , <br />and crimping into the soil ie recommended following drilling of eeod <br />on all elopes steeper than 6:1, <br />Tho floor of the pits should be ripped, topsoil applied, aeed'ued <br />firmed and tho same grass seed mixture drilled, <br />• ldhile fertilizer ie not necessary' where true topsoil is reapplied, <br />other areas gill benefit from application of fertilizer according to <br />soil tests, In absence of a test, apply !~0 lbs, of Nitrogen Ead ly0 <br />lbs, of phosphate. <br />Diversion ditches should be constructed on the natural terrain <br />above the cut banks to divert water to non-erosive outlets, <br />Reclaimed areas should be fenced to protect them from all (SrazinQ <br />during the first three years of establishment and longer if necoae~ryo <br />Production of forage will be enhanced if the ranch owner trill main- <br />tain protective fences and graze the reclaimed areas as separate units, <br />The small pond could be preserved as a source of water for wildlife, <br />Enclosures: Soil Survey Interpretations, <br />Schamber and Fort Collins series <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.