My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE58589
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE58589
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:00:51 PM
Creation date
11/20/2007 5:56:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1990025
IBM Index Class Name
Permit File
Doc Name
CONTROL OF WORK AUTHORITY OF THE CNTY ENGINEER
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />It is recommended that no surface treatment (chip <br />~ seal) be applied unless the air temperature <br />is at least 70 degrees F. and rising. <br />C. Plant Mixed Asphalt Pavement: <br />When plant mix material is to be used for paving, <br />specifications and application processes shall be <br />submitted to the County Engineer for approval prior <br />to application. These shall include, but not be limited <br />to, the specifications Por the aggregate, bituminous <br />materials, add-mixes, application temperatures and <br />quality-control procedures. <br />VIII <br />IX <br />X. <br />XI <br />UTILITIES <br />When utility type devices are to be installed within the <br />County Road Right-of-Way, the County policy on Utility <br />Use of County Rights-of-Way shall apply. <br />TRAFFIC CONTROL <br />A. Approved barricades, warning signs, and flagmen shall <br />be used in connection with all road work. <br />B. Road designation and traffic control signs as required <br />by the County Engineer shall be installed in an approved <br />manner prior to acceptance of the road. <br />BRIDGES AND HULTIPLATE STRUCTURES <br />When bridges or multiplate structures are to be installed, <br />complete plans and specifications shall be submitted to <br />the County Engineer for approval before beginning construction. <br />GUARANTEES <br />All road construction performed by contractors and/or developers <br />to be accepted into the County Road System shall be guaranteed <br />for a minimum of one year to meet the continual standards <br />to which it was constructed. Such guarantee may be by <br />bond, cash deposit, pledged securities, or other valuable <br />considerations acceptable by the Board of County Commissioners. <br />XII. AMENDMENTS <br />The Board of County Commissioners may from time to time <br />amend these regulations by resolution. <br />
The URL can be used to link to this page
Your browser does not support the video tag.