Laserfiche WebLink
,~ . <br />~c <br />BASIN RESOURCES, INC. <br />SEDIMENTATION POND INSPECTION FORK <br />GOLDEN EACLE <br />~~ Date of Ina <br />~• <br /> <br />003 <br />No. <br />EMBANKMENT - - <br />1. Adequacy o! the vegstatiise cover: Excellent Moderate, Few, Poo <br />2. Erosion forming gullies: Extensive, Soma,, Very Few, <br />~. <br />'~' 3. is wave action causing erosions <br />On the upstream est~bankmentT Yes No~ <br />At the principal spillway inlet? Yes No <br />4. Erosion of the downstream toe of the embnnkment:? Yea No~ <br />The cause of the erosion is attributed to: <br />5. is seepage occurring through the dam? Yea _ No_~___ If e <br />could this seepage cease potential instability?' Yes No~ <br />Explein• <br />PRIN~,IPAL SPILLMAY <br />1. Is the principal apillxny system in working orde~rT Yes~Mo_ <br />2. is the inlet free of debris and restrictive siatarial?Yas~No_ <br />~ `` ~ 3. Is the discharge outlet free of restrictive materinl7 Yes~No_ <br />4. Is erosion occurring at the discharge outlet? Yes No~~If <br />yes, <br />evaluate the severity: Extensive Moderate Just starting NonE <br />~~, <br />EMERGENCY SPII.Li1AY ' <br />1. is the overall emergency spillway system capa4le of passing <br />design storm discharge? Yes ~No <br />2. Does it appear as if the emergency'spillwey has discharged water <br />since the last inspection? Yea No~_ <br />3. Is erosion occurring at any section of the emergency spillway? <br />Yea No~_ Describe the <br />extent , <br />SEDIMENT 3TOR_-GE CA_PAGITY <br />1. Hns the design storage capacity of the reservoir been surpassed? <br />''~ Yes Nom I! yes, <br />:; <br />explain: + <br />~~`'~,,;~,' Please ndd any special comments concerning potentially dangerous <br />problems on the back of thi^ ^heet. <br />Inspector ~ /~4 <br />G <br />