Laserfiche WebLink
-~ <br />~ ~ BASIN RESOURCES, INC. <br />SEDIMENTATION POND INSPECTION FORK <br />PORd GOLDEN EAGLE RIVER POND <br />NPDES No. <br />j ~~ Date of Inspection Jo. ' <br />~MHAI~IRl1E6TP <br />1. Adequacy of the vegetative cover: xcellen ;Koderate, Few, Poo <br />2. Erosion loaning gullies: Extensive, Some, Vsry Few, on <br />3. Is wave action causing erosion: <br />On the upstream embankment? Yes No <br />At the principal spillway inlet? Yee No <br />4. Erosion of the downstream toe of the embankment? Yea No~_ <br />The cause of the erosion is attributed to: <br />5. Is seepage occurring through the dam? Yee No~_ If e, <br />could this seepage cause potential instability~t Yea No~ <br />Explain: <br />PRINCIPAL SPILLMAY <br />1. Is the principal spillway system in working order? Yes~lfo_ <br />2. is the inlet free of debris and restrictive sate~rial7Yea~Ko_ <br />~'= <br />- 3. Is the discharge outlet Erna of restrictive material? Yea~_No_ <br />4. Is erosion occurring at the discharge outlet? Y'es No~If <br />YeB. <br />evaluate the severity: Extensive Moderate Just starting one <br />.~ <br />EMERGENCY SPILLWAY ' <br />1. Is the overall emergency spil w y system capable of passing <br />design storm discharge? Yes No <br />2. Dona it appear as if the emergency'spillw y has discharged water <br />since the last inspection? Yes No~ <br />3. Is erosion occurring at any section of the emergency spillway? <br />Yes No~_ Describe the <br />extent <br />SEDIMENT STORAGE CAPACITY <br />1. Has the des n storage capacity of the reservoir been surpassed? <br />YeB No~ If yes, <br />. explain: ~ <br />,:. .. ., <br />i .:.~:r~' Please add any special comments concerning potentially dangerous <br />problems on the beck of this sheet. <br />Inapector~~,L_~ ~~ <br />