Laserfiche WebLink
iii iiiiiiiiiiiiiiii <br />E~~A <br />S Coal Company Seneca Coal Company <br />October 23, 1996 <br />Mr. Harry Ranney <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-2273 <br />R$: Seneca II Mine (C-80-005) Quarterly Stockpond Inspections <br />Dear Mr. Ranney: <br />Enclosed are copies of the third quarter stockpond inspections <br />for those structures at Seneca II which have been constructed to <br />date. The 'as-built' certifications for those stockponds which <br />do not already have an existing 'as-built' report or which have <br />been modified from the original will be submitted as soon as <br />possible, once the field surveys have all been completed. <br />Several new stockponds were constructed this quarter and <br />maintenance activities occurred on those which required some <br />form of work be done to them. <br />Should you have any questions, please do not hesitate to call. <br />Mic ~~ G28OFR~ltavil~a, P.E. <br />Eng' ring Mai~~~' <br />Enclosure(s) <br />c: Dennis Jones (SCC) <br />Gary Wendt (PWCC) <br />OCT 2 3 1996 <br />Seneca Coal Company • P.O. Drawer D • Hayden, Colorado 61639 <br />Telephone (970) 276-3707 • FAX (970) 276-3014 <br />