Laserfiche WebLink
• <br />TABLE 49A <br />Topsoil Stockpile Summary <br />• <br />STOCKPILED ID CURRENT VOLUME <br />(CY) VOLUME TO BE ADDED <br />(CY) TOTAL VOLUME <br />(CY) <br />FCB-1 7,400 0 7,400 <br />FCB-2 350 0 350 <br />FCB-3 170 0 170 <br />FCVF-1 345 0 345 <br />SSS-1 1,980 0 1,980 <br />RDT-1 807 0 807 <br />W WTF-1 4,000 0 4,000 <br />SF-1 54,842 0 54 842 <br />SF-2 55,861 0 55,861 <br />SF-3 109 4 ] 0 0 109,410 <br />SF-4 3,633 0 3,633 <br />SF-5 700 0 700 <br />SF-6 96,540 444 96,984 <br />SF-7 38,700 0 38,700 <br />SF-8 4,100 0 4,100 <br />SF-9 5 800 0 5,800 <br />SF-10 325 0 325 <br />SF-II 100 0 100 <br />PPSP-1 6 300 0 6,300 <br />PPSP-2 4,170 0 4,170 <br />SF-12,13,14 154,880 0 154,880 <br />SF-IS 0 807 807 <br />SF-16 0 2,200 2 200 <br />SF-17 0 888 888 <br />TOTAL 550,413 3,340 553,753 <br />(1) The volume listed for SF-12, 13, & 14 is split between the three stockpiles and is shown on Map 29 at SF-12 <br />EASTERN MINING DISTRICT <br />Dewaterin Borehole 7,224 0 7,224 <br />Dewatering Treatment Pond <br />includes access road <br />0 <br />6 295 <br />6 295 <br />Ventilation Site 4,763 0 4,763 <br /># 7 North Esca a Shaft 2,222 0 2,222 <br />TOTAL 14,209 6,295 20,504 <br />NORTHERN MINING DISTRICT <br />r ~ <br />L_J <br />Power Borehole 0 5711 5711 <br />Ventilation Shaft & Road 0 2563 2563 <br />18Rt Shaft & Road 0 5402 5402 <br />TOTAL 0 13676 13676 <br />TR 04-44 <br />5/3/04 <br />