<br />1 <br /> <br /> <br /> <br /> <br />1 <br />1 <br /> <br /> <br />1 <br /> <br /> <br /> <br />The Ready Mixed Concrete Company plans to have both a mining and <br />concrete batching operation located on the property. There are <br />three areas of consumptive use that arise from an operation of <br />this type. These include moisture loss Prom gravel hauled from <br />the property, dust control of haul roads and water used in the <br />concrete batch plant. <br />Water losses due to lake evaporation during mining is not <br />considered as a consumptive use. This is based o» the current <br />ruling by Judge Behrman in Division I Water Court on the Zigan <br />Case. It was specifically stated in Chia case that water <br />augmentation for lake evaporation is not required during mining <br />operations. The case is currently being appealed in the Colorado <br />State Supreme Court by Mr. Zigan and the State Engineer. Unless <br />Judge Behrman~s ruling is changed, the mining plan will not <br />require additional augmentation. <br />Moisture loss from gravel hauled <br />average 3 1/2% moisture content. <br />ton. The operation will produce <br />year for sn average of 9.82 afy. <br />from the property is based on an <br />This translates to 6.4 gallons/ <br />approximately 500,000 tons per <br />The concrete batching operation is based on an operation that <br />moves 120 loads per day or 600 loads per week on the average. A <br />concrete truck uses 240 gallons of water per load. This <br />calculates a yearly average consumptive use of 22.98 afy. <br />Dust control will be provided for the haul <br />concrete batch plant. No dust control is <br />mining area due to the use of conveyors <br />material. Approximately 2,400 linear fee <br />watered for dust control. It is estimated <br />afy would be required to maintain the haul <br />the year. <br />roads leading to the <br />needed for the actual <br />Por transporting the <br />t of haul road will be <br />that a total of 1.95 <br />roads for 6 months of <br />' A total of 26.85 afy would be used consumptively by these three <br />operations. The water rights that are owned by the Ready Mixed <br />Concrete Company have a historic consumptive use ranging between <br />200 afy to 239 afy for agricultural irrigation. Since these <br />wells have historically used this much water under the <br />administration of the State engineers Office, it is assumed that <br />there are adequate supplies for the proposed mining operation. <br />' Floodolain Impacts <br />The ma,7or portion of the proposed mining operation lies within <br />t the floodway of the Bouth Platte River. The mining plan has bean <br />designed such that no impact will be felt by adJoining property <br />owners. Oravel mining operations in general are beneficial to a <br />' river floodway. The creation of the lakes actually increase the <br />amount of temporary storage available for mayor floods. <br />G-4 <br />