Laserfiche WebLink
-ii iii~iiiiiiiiiiii <br />~,~ <br />sEIVEC~4 Seneca Coal Company <br />April 11, 1996 <br />!~~rFIVFC <br />Ms. Janet Binns APR 75 <br />Division of Minerals and Geology X996 <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-2273 Division or minerals&Geology <br />RE: Seneca II Mine (C-80-005) Quarterly Stockpond Inspection <br />Dear Ms. Binns: <br />Enclosed are copies of the first quarter Stockpond inspections <br />for those structures at Seneca II that have been certified. <br />Inspections for Stockponds T-15, T-16, T-25, T-26, T-28, T-30 <br />and T-31 are also included. Construction of these Stockponds has <br />been done, but they require some maintenance work to make them <br />complete. The 'as-built' certifications will be submitted as <br />soon as possible once they are finished. <br />Maintenance work on all Stockponds has ceased for the winter. <br />Once the weather and ground conditions become favorable, work <br />will be initiated again this spring. Most of the entire mine <br />area was under snow cover and very little was observable at each <br />Stockpond location. Comments from the last inspection in <br />December were not removed from the inspection sheets because all <br />maintenance work still needs to be completed this year. <br />Should you have any questions, please do <br />Since ~ ~~. ~G. A~j <br />~~ ~~ <br />M1ch `~. Alt <br />Engin ,~~~g-MSY <br />Enclosure(s) <br />c: Dennis Jones (SCC) <br />Gary Wendt (PWCC) <br />to to call. <br />a, P.E. <br /> <br />APR 11 1996 <br />Seneca Coal Company P.O. Drawer D Hayden, Colorado 81639 <br />Telephone (970) 276-3707 FAX (970) 276-3014 <br />