My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE58484
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE58484
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:00:45 PM
Creation date
11/20/2007 5:53:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977317
IBM Index Class Name
Permit File
Doc Name
RED MTN CLAY CO CEDARWOOD CLAY MINE PERMIT APPLICATION
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />' EXHIBIT B <br /> Mining Plan <br />' Th <br />t <br />f thi <br />l <br />i <br />ti <br />i <br />t <br />b <br />hi <br /> e curren <br />opera <br />or o <br />ay m <br />s opera <br />s c <br />ne <br />egan <br />on <br />n <br />' 1967. The area mined since 1976 is indicated on the mining plan map. <br /> Production quantities for the years 1913-1976 were used to determine <br />' area projection required for the mining plan. They are as follows: <br /> 1973 - 13,222 Tons <br />' 1474 - 18,821 Tons <br /> 1975 - 8,184 Tons <br /> 1976 - 11,634 Tons <br /> The operator has indicated a projected recovery rate of approximately <br /> 12,200 Tons per year. The average overburden is 58% comprised primarily <br /> of 4 feet of topsoil underlain by 10 feet of sandstone and 10 feet of <br />' clay. Maximum pit depths are in the 25 foot range and typically are less <br /> than 20 feet. Using a 20 foot average depth and a 58% overburden value, <br /> it is projected that one to two and one-half surface acres per year will <br />' be disturbed. <br /> Less than one-half acre of additional land is occupied by haul roads <br /> and stock outs. <br /> The mining plan will consist of topsoil removal by dozers and the <br />' stockpiling of the topsoil. Some blasting may be required to break up the <br />' sandstone cap prior to its removal. It is anticipated that the stack out area <br /> for topsoil can be established in previously mined areas. The clay will <br />' be excavated to an approximate maximum depth of 25 feet by front end <br /> loader which places the material in dump trucks for delivery to a pro- <br /> site <br />cessin <br />r <br />ted i <br />P <br />bl <br />S <br />it B <br />i <br />N <br />t <br />b <br />k C <br /> g <br />ope <br />a <br />n <br />ue <br />o <br />r <br />o. <br />o wa <br />er usage <br />y <br />umm <br />c <br />' is anticipated at the mine site and no surface or ground water is <br /> retained except for short periods after heavy rains. Mining operations at <br />' this pit are intermittant and occur not more than 90 days of the year and <br /> <br /> only as this clay type is needed by the rick factory in their operations. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.