<br />can be transported via the product pipeline to the Parachute Site. Final processing will <br />occur at the Parachute Site. <br />D.2 Project Component Descriptions and Earthmoving Requirements <br />The nahcolite solution mining process itself does not involve earthmoving. However, <br />earthmoving will be required for construction of drill pads, well field piping, surface <br />structures and facilities, ponds, pipelines, utilities, access roads, and other project <br />components. <br />D.2.1 Drill Pads <br />Each solution mining well will require a drill pad for the drill rig and other drilling <br />equipment. The drill pad will be a leveled area with approximate dimensions of 150 <br />feet by 80 feet (0.28 acre). After an access road is constructed for a well, vegetation <br />would be cleared, and topsoil will be removed and stockpiled within the drill pad area. <br />Topsoil would be reused in the future for final reclamation of the well field. A track <br />exca•: ator (bulldozer, track hoe) will be used to do the initial surface work, and a grader <br />will be used to do the final surface leveling of the drill pad. Standard cut and fill <br />techniques will be used in construction of each drill pad. <br />Approximately 453 wells will be mined during the first 30 years of operations. They <br />will be located within the six 5-year mining panels, which cover approximately 1,030 <br />acres of the 4,084-acre Piceance Site. Approximately 76 of these wells will be located in <br />the 0-5 year mining panel, which covers an area of approximately 160 acres. A <br />preliminary well layout plan for the 0-5 year mining panel is shown in Figure D-3. The <br />disturbed area for drill pads in the 0-5 year panel is included in Table D-1, which <br />outlines total disturbance for each panel. <br />Drill pads will not be constructed at the Parachute Site or along the pipeline route <br />because solution mining is limited to the Piceance Site. <br />D.2.2 Well Field Piping <br />Well field piping will consist of three types of piping: main header piping, lateral <br />piping, and individual well piping. The main header system will cross each 5-year <br />mining panel and will feed the initial processing plant, as shown in Figure D-3. The <br />main header pipe racks will be located along the main well field access road for each <br />mining panel. Off the main header system, a series of lateral pipe systems will be <br />routed into different areas of the well field to connect to the individual well piping. <br />Individual piping will be connected to each well head. <br />The main header and lateral systems will require a cleared corridor width of 10 feet and <br />an additional 10 feet of corridor for construction. The individual well piping will <br />D-3 <br />