Laserfiche WebLink
<br />EXHIBIT L - Reclamation Costs <br />May 11, 1979 <br />CONFIDENTIAL <br /> <br />Reclamation Costs in Dollars Per Acre <br />Topsoil replacement delivered at the mine site <br />(545 cubic yards per afire @ $2.50) <br />Spreading <br />(1/2 hours dozer work @ $57/hr) <br />Tilling <br />Seed & Fertilizer <br />Mulch (3,000 lb. acre) <br />Grading <br />(4 hours dozer work @ $57/hr.) <br />TOTAL <br />$ 1,362.50/Acre <br />23.50/Acre <br />30.00/Acre <br />100.00/Acre <br />120.00/Acre <br />228.00/Acre <br />$ 1,864.00/Acre <br />The grading and sloping figure is based on what will probably <br />be an average time. At present, most of the mined area is graded and <br />needs no further grading or sloping. <br /> <br />