Laserfiche WebLink
ASHBAUGH USR <br />1. Mining and crushing of gravel is to be used on county roadway for maintenance and <br />construction. <br />2. This operation is consistent with the Weld County Comprehensive Plan as the plan <br />allows for the extraction of sand and gravel and promotes reasonable development. <br />3. The proposed site is located within the Agricultural District. This zoning designation <br />allows for the extraction of sand and gravel as a Use by Special Review within that <br />district. <br />4. The site is surrounded by pasture land. Upon completion, the site will be reclaimed and <br />returned to pasture. <br />5. a. Depending on phase of operation,- 3 to 20 people. <br />b. Mining and crushing phase, 3 to 5 people <br />c. Summer Hours: 6:00 am to 4:30 pm, Monday through Thursday <br />Winter Hours 7:00 am to 3:30 pm, Monday through Friday <br />d. N/A -portable operation <br />e. -0- <br />f. During mining operation - 1 Hitachi 450 excavator, 2 Cat 30T haul trucks, 1 Cat <br />D-7 dozer, and pickups <br />Crushing operation - Cedarapids crusher, conveyor, Volvo 2201oader, <br />Cat D-7 dozer, pickups <br />Tandem and semi trucks used to haul material off site. <br />Could hau13 to 10 loads each per day, depending on haul distance. <br />G. New Raymer Fire District, county vehicles are equipped with fire extinguishers. <br />Any fuel tanks will be bermed. <br />All safety precautions will be taken. <br />h. Domestic well located at house '/< mile south of site. <br />No irrigation wells. County vehicles have drinking water dispensers. <br />i. County supplied Porta-Pottys, temporary facilities serviced weekly <br />j. No storage or wazehousing. Gravel to be stockpiled. <br />6. No additional landscaping. Site is pastureland and will be reclaimed as such. Seeding <br />recommendations of NRCS and landowner will be followed. <br />7. Reclamation will be concurrent with mining operations. As phases aze completed, topsoil <br />will be applied and area will be seeded per NRCS recommendations. Disturbances will <br />be minimized as much as possible. <br />8. Weld County has applied for a storm discharge permit from the State Health Department <br />WQCD. Material stockpile sites will be bermed. <br />9. The county has a 10-year lease; reclamation will be concurrent with operation. <br />10. N/A. There will be no storage of waste material on site. <br />M:UliningWSHBAUGH USR.doc <br />