Laserfiche WebLink
COLORADO DEPARTMENT OF HEALTH, Water Quality Control Division <br />Rationale - Page 3. Permit No. CO-0032115. <br />ID. FACILITY DESCRIPTION <br />A. Industry Description <br />The facility is a surface sub-bituminous coal mine. There aze three <br />active pits, from which coal is mined and then hauled directly to the <br />adjacent Craig Generating Station. All coal produced is sold to <br />Colorado-Ute, which owns the station. The average production rate is <br />2.2 million tons/year, with a maaimum rate of 2.6 million tons/year. <br />The facility is covered under federal regulation 40 CFR 434, the Coal <br />Miaiag Point Source Category, Subpart D, Alkaline Mine Drainage, and ' <br />Subpart F, Miscellaneous Provisions, Effluent Limitations for <br />Precipitation Events. <br />B. Wastewater Treatment Description <br />Treatment is provided for all of the wastewater sources by sediment <br />ponds. The wastewater sources are surface runoff, surface mine <br />dewateriag, spoil springs, and as industrial waste pond. This waste <br />pond receives runoff from the truck fueling area and the shop area, <br />wastewater from the truck washing facility, and can be used to contain <br />fuel spills from tanks. No chemicals are used for the truck washing. <br />The pond provides settling, and tw oil booms are is place near the <br />outfall to remove oil and grease. Two concrete underground oil <br />separator tanks are also provided after the pond outfall. The <br />effluent then goes through two sediment ponds before discharging at <br />002. <br />Discharge points 012, 013 and 014 are proposed but not yet <br />constructed. The permittee plans to construct them in middle to late <br />1991. Ia order to avoid a permit amendment when the points are put <br />into active use, they are included in the permit renewal. (The <br />permittee must therefore submit discharge monitoring reports for these <br />points whether they are active or not.) <br />For discharge points 001, 005 and 011, the parshall flume for flow <br />monitoring is located downstream of the sediment pond overflow. At <br />001, this situation will be changed is the summer of 1991, when the <br />final pond is rebuilt and the flume incorporated into the pond <br />overflow. At 011, the flume is 50 feet downstream, but the pond has <br />never discharged, and so no change is considered necessary. At 005, <br />the flume is also about 50 feet downstream. There are seeps in <br />between the pond and the flume, sad so flow could be measured at the <br />flume while no discharge is occurring from the pond. However, the <br />pond only discharges when the headgates are opened, which is done <br />during spring runoff and during large storm events, and so the only <br />problem anticipated in flow monitoring is is the accuracy of the <br />readings. Therefore, the permittee will be required to submit all <br />data collected for the past year on the seep flow volumes at 005 and <br />011, and then on an on-going basis to be submitted with their <br />Discharge Monitoring Reports (see Part I.B.2 of the permit). <br />