Laserfiche WebLink
CIRCES Cost Estimatinst Software <br />CATION sheet 1 of 2 <br />Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br />Task # : 298 State :Colorado PermiUjob # : C-80-007 <br />Date :01/08/2007 County :Gunnison Abbreviation :none <br />User : TAK Site :West Elk Mine Filename :0007-298 <br />Permit or other job action :Permit Renewal Rn-05 <br />Task description :Mobilize equipment three times for long-term maintenance <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 perday <br /> Cost data source : CRG Data <br />Truck tractor description :Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description :Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br /> Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cosUhour : $16.63 $18.37 $22.33 <br /> Operating cosUhour : $44.38 $46.13 $50.07 <br /> Operator cosUhour : $27.66 $27.66 $27.66 <br /> HelpercosUhour: ~ $0.00 $25.39 $25.39 <br /> Total Unit CosUhour : $88.67 $117.55 $125.45 <br />Machine <br />Description WeighUunit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />CosUhr/unit Fleet Size <br />(No. units) Haul Trip <br />CosUhr/fleet Return Trip <br />CosUhr/fleet DOT permit <br />Cost/fleet <br />-Cat D3G LGP - 3P 9.69 $11.45 $88.67 3 $300.35 $266.01 $0.00 <br />-CAT 12H 14.41 $21.30 $88.67 3 $329.92 $266.01 $0.00 <br />Subtotals <br />