My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE58363
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE58363
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:00:39 PM
Creation date
11/20/2007 5:50:31 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
2/13/2007
Section_Exhibit Name
Exhibit 53 Bond Liability Calculations Part 3
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :Permit Renewal RN-OS <br />Task description : Regrade Deer Creek shaft 1-acre drill pad and 0.26-acre access road <br />Basic machine :Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br />Source of estimated volume :1.26 acres X 1 ft. <br />Source of estimated swell factor : DRMS estimate <br />2,541 LCY <br />Source <br /> Operator skill : 0.75 (avg.) <br />Averege push distance : 125 feet Material consistency : 1.00 (Cat HB/ <br />Unatljusted hourly production : 1,055.8 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshi/t/day) <br />Consolidated stockpile Spoil pile : 0.80 (fnd-1t) <br /> Push gradient : 1.11 (Cat HB) <br />Average push gradient : 5.00 % (neg) Altitude _ <br />1.00 (Cat HB) <br />Average site altitude : 7,500 feet Material weight : 0.79 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2, 900 Ibs/LCY Net correction : 0.44 <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Eadh Adjusted unit production : 464.87 LCY/hr <br /> Adjusted fleet production : 464.87 LCY/hr <br /> <br /> <br />JOB TIME AND COST ,,. <br />>. <br />; <br />Feet size : 1 Dozers) Total job time : 5.47 Hours <br />Unit cost : $0.440 lLCY Total job cost : $1,118 <br />Utilization <br />$72.92 NA <br />$98.84 100 <br />$0.00 0 <br />$32.78 NA <br />$204.53 To <br />Loose <br />1.250 volume <br />Data source : (CR6) <br /> <br /> <br /> <br /> <br /> talfleetcosUhour: <br />
The URL can be used to link to this page
Your browser does not support the video tag.