My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE58363
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE58363
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:00:39 PM
Creation date
11/20/2007 5:50:31 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
2/13/2007
Section_Exhibit Name
Exhibit 53 Bond Liability Calculations Part 3
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimalina Software <br />TRUCKING -ONLY WORK <br />Task # <br />Date <br />User <br />Agency or organization name :Colorado Division O/Reclamation, Mining And Sakry <br />291 State :Colorado Pennitijob # : C-80.007 <br />11248006 County:Gunnison Abhreviation:none <br />TAK Site: West E/k Filename:0007-291 <br />Job utilization <br />Ownership cosVhour: $16.84 NA <br />Operating cesUhoun $25.86 100 <br />Operator cosUhour: $21.75 NA <br />Permit or other job action :Permit Renewal RN-05 <br />Task description :Haul oNSite excavated embankment borrow material (/Syl. G. Rd. extension <br />Model :Generic 1412 cv, sx4 <br />Cost Breaktlown <br />Total unit wsUhour: $84.45 <br />Inigal <br />volume <br />Swell <br />8,834 LCY factor: NA <br />Shi% basis : 1 per day <br />Horsepower: 255 <br />Weight (UST) : 7.30 <br />Cost data source : (CRG) <br />Total Fleet cosUhour: <br />Loose <br />volume: 8,834 LCY <br />Source of quantity taken%: Assume 25% ofrotal31,331 borrow material (Vol. 151, swelled 16.5% <br />Source of estimated swell factor : NA <br />Material Durchase cost : $0.00 /LCY Total cost : $0 <br />.. ..: .. % .. ;. ~: r:: :;. <br />HOURLY PRODUCTION ~~- <br />Hauling CaoaciN <br />Truck Payload (weight) Basis : Truck Bed (volume) Basis' <br />Material tlescnption <br />Decomposed mck - 50% Rock, 50% Earth <br />Rated payload: 35400 pountls <br />Payloatl capacity: 12.21 LCV <br /> <br />Truck Cvcle Time <br />2.00 mile haul [rip at: 15.0 mph (avg.) _ <br />2.00 mile reNm trip at : 15.0 mph (avg.) _ <br /> <br />Job Condition Correction Factors <br /> <br />Average site altitude : 6,900 feet <br />Altitude adjustment factor: 1.00 (Caf HB) <br />Job efficiency factor: 0.83 (15hi%/day) <br /> <br />Net job correction : 0.83 <br />JOB COST <br />Fleet Size: 1 Truck(s) <br />Struck volume: 10.00 LCY <br />Heapetl volume: 12.00 LCY <br />Average volume: 11.00 LCY <br />Adjusted volume : 11.00 LCY <br /> $OU1CR <br />Exchange time (min.) : 0.50 (Cat HB) <br />Load time (min.) : 202 (Cat HB) <br />Haul time (min.) : 800 (mi./mph)x60 <br />Dumptime (min.) : 0.90 (Cat HB) <br />Retum time (min.) : 8.00 (mi./mph)x60 <br />Total cycle time : 19.43 minutes <br />Unadjusted unit production : 33.98 LCV/Hour <br />Adjusted unit production : 28.20 LCYMOUr <br />Adjusted Fleet production : 28.20 LCY/Hour <br />Total job Ume : 313.25 Hours <br />Unit cost: $2.285 /LCY Total job cost: $20,190 <br />
The URL can be used to link to this page
Your browser does not support the video tag.